My WebLink
|
Help
|
About
|
Sign Out
Home
2018.05.07 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2018 CC Packets
>
2018.05.07 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2020 3:30:59 PM
Creation date
5/4/2018 9:23:53 AM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
5/7/2018
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Rachel Juba <br />May 3, 2018 <br />Page 2 <br />Grading, Street, and Utility Plans <br />4. The Approved grading plan allows for mass grading outside of the first and second phases. <br />The grading plan reflects the first and second phase boundaries as well as future phases. <br />Grading to the eastern property limits in the southeastern portion of the site has not yet been <br />approved. The development team is required to provide additional survey and confirmation <br />that there will not be any drainage concerns caused by proposed grading. <br />Wetland <br />5. Staff will continue to work with the applicant on the exact location and style of the <br />boardwalk that will cross wetlands in three locations. The applicant should identify any <br />temporary impacts to wetlands associated with the boardwalk. <br />Revised Water Reuse Plan <br />6. The applicant has provided plans related to stormwater reuse that will be incorporated into <br />this phase. Water reuse plans are consistent with meeting previously noted requirements. <br />Thank you for the opportunity to provide comments on this project. Additional detailed red - <br />lined comments have been provided to the applicants engineer. These comments will need to be <br />addressed prior to approval of the construction plans. If you have any questions, please do not <br />hesitate to contact me at 651-286-8463. <br />Sincerely, <br />WSB & Associates, Inc. <br />Mark Erichson, PE <br />City Engineer <br />cc: Scott Anderson, Public Works Director (email only) <br />Steve Duff, Senior Engineering Technician (email only) <br />Stephanie Hatten, Water Resource Engineer (email only) <br />Steph Griffin, Excelsior Group (email only) <br />John Bender, Westwood Professional Services (email only) <br />S:I ,—e R_Jub.T.,h,IDElELOPMENTPROJECTSIA—dSauth Adelaide LandinglAdelaide Landing2ndAdd Final Pi.al gMemo Adelaide Landing2adFP-050318.d- <br />
The URL can be used to link to this page
Your browser does not support the video tag.