My WebLink
|
Help
|
About
|
Sign Out
Home
2018.05.07 RESO 2018-7 Adelaide Landing 2nd Add Final Plat and DA
Hugo
>
City Council
>
City Council Resolutions
>
2018 CC Resolutions
>
2018.05.07 RESO 2018-7 Adelaide Landing 2nd Add Final Plat and DA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2018 1:57:53 PM
Creation date
5/8/2018 1:57:53 PM
Metadata
Fields
Template:
City Council
Document Type
Resolutions
Meeting Date
5/7/2018
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Resolution 2018-7 <br />Adelaide Landing 2nd Final Plat and Development Agreement <br />e) Outlot E proposed for future development, and will remain in the developers <br />ownership. <br />6. The developer shall design and install a stormwater re -use system for irrigation of the <br />individual lots. <br />7. The developer shall establish a property owners association for the development to <br />own/operate/maintain common elements, landscaping, and the water re -use system. All <br />landscaping within the right-of-way in the street islands is to be installed by the developer <br />and maintained by the property owners association. The property owners association <br />documents shall be reviewed and approved by staff prior to recording the plat. <br />8. The plat shall comply with the City's street naming system. <br />9. The landscaping planned for the plat shall be installed in one phase. The developer shall <br />take proper precautions to protect the trees as the homes are being built. <br />10. Each home shall include a minimum of 2 parking spaces within the driveway. The <br />driveway widths shall be a maximum of 24 feet at the right of way line. <br />11. Staff will continue to work with the applicant on the street lighting plan. Exact locations <br />of the street lights shall be reviewed and approved by staff prior to installation. <br />12. The developer shall obtain all necessary local, state, and federal permits. <br />13. Prior to recording the final plat: <br />a)' The developer shall provide one-third ($521,840.00) of the construction cost in <br />escrow money to the City or other payment method approved by the City for the <br />improvements to 130th Street per the cost sharing agreement. This will satisfy 2/3 of <br />the payment required from the developer. <br />b) The developer must obtain all necessary stormwater management and wetland <br />conservation act (WCA) permits from the City. <br />c) The developer shall pay $78,960.00 in fall to satisfy the required cash in lieu of <br />parkland dedication requirement. <br />d) The developer shall pay the sewer and water trunk fees for each lot at final plat. The <br />City's SAC and WAC fees will be paid at the time building permits issued. <br />e) The developer shall obtain approval from Xcel Energy on the crossing of the <br />powerline easement. <br />f) The developer shall obtain approval from Koch on the crossing of the gas line <br />easement. <br />
The URL can be used to link to this page
Your browser does not support the video tag.