My WebLink
|
Help
|
About
|
Sign Out
Home
2018.06.04 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2018 CC Packets
>
2018.06.04 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2020 3:16:24 PM
Creation date
5/31/2018 2:04:15 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
6/4/2018
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Approval and Conditions <br />Based on the information provided in the Joint Wetland Permit Application prepared by Ken Meek, <br />Earth Science Associates, Inc., and dated March 2018, and the addendum dated April 2018, as well as <br />supporting does submitted after the addendum, the application for sequencing flexibility, sequencing, <br />and wetland replacement is approved with the following conditions: <br />1.) No wetland impacts will occur until the applicant has provided confirmation from BWSR that 1.82 <br />acres of wetland credit has been withdrawn from wetland bank account 1649 to replace the 0.91 acres of <br />proposed wetland impact. <br />2.) No additional impacts will occur to wetlands (temporary or permanent) within the project area <br />beyond the proposed 0.91 acres. <br />3.) The applicant will monitor wetland hydrology for wetland basins, A, B, C, D, E, G, and J and submit <br />a written report detailing the hydrology (inundation or saturation) for the basins and how observed <br />hydrology compares to that of existing hydrology for a period of three years following the year after <br />construction is complete. A reduction in hydrology may be considered an impact and require <br />replacement under MN Rule 8420.0111 subp. 34. <br />Bank Account # <br />Bank Service Area <br />County <br />Credits Approved for Withdrawal <br />1649 <br />7 <br />Hennepin <br />(sq. ft. or nearest .01 acre) <br />1.82 <br />Replacement Plan Approval Conditions. In addition to any conditions specified by the LGU, the approval <br />of a Wetland Replacement Plan is conditional upon the following: <br />❑ Financial Assurance: For project -specific replacement that is not in -advance, a financial assurance <br />specified by the LGU must be submitted to the LGU in accordance with MN Rule 8420.0522, Subp. 9 <br />(List amount and type in LGU Findings). <br />❑ Deed Recording: For project -specific replacement, evidence must be provided to the LGU that the <br />BWSR "Declaration of Restrictions and Covenants" and "Consent to Replacement Wetland" forms have <br />been filed with the county recorder's office in which the replacement wetland is located. <br />BWSR Forms 11-25-09 Page 4 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.