My WebLink
|
Help
|
About
|
Sign Out
Home
2018.06.04 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2018 CC Packets
>
2018.06.04 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2020 3:16:24 PM
Creation date
5/31/2018 2:04:15 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
6/4/2018
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REVISION 1.2 <br />This revised application incorporates the project evolution and additional information requested since the <br />March 2018 submittal of the initial application. The initial application presented four (4) project alternatives and <br />proposed on -site wetland mitigation. <br />The Addendum, submitted March 30, 2018, addressed preliminary Army Corps of Engineers comment. The <br />March 30th addendum included off -site alternative analysis of four (4) alternate locations. An additional fifth <br />(5th) project alternative, dated 3/29/18, was presented which reduced wetland impact from 1.07 to 0.91 acres. <br />The additional avoidance and minimization was accomplished by eliminating one lot (Lot 10 of Block 1 was <br />eliminated) and the use of a retaining wall, rather than a side slope, below the cul-de-sac above wetland P in the <br />southeast part of the development. Additional impact reduction was not feasible from engineering and safety <br />standpoints. As explained in the addendum, wetland BB could not be avoided since the existing elevation of BB <br />is higher than adjacent Street 1 and stormwater Pond 8. Therefore, the hydrology to BB, which is surface water <br />dependent, would be cut-off by the development of the surrounding land. The elevation of Pond 8 is dictated <br />by run-on drainage from the south and the elevation of Street 1 is dictated by the elevation of Wetland B. <br />Impact reduction to wetland L, in the back yard of Lot 12 along the east side of Street 3, could be achieved by <br />installing a retaining wall at that location. This option is not feasible from a safety perspective since a retaining <br />wall in a back yard would present a hazard to small children playing there, or to residents otherwise using this <br />outdoor living space. <br />At the conclusion of the April 23 d TEP meeting it was determined that a revised Wetland Replacement Plan <br />application, rather than another addendum, should be submitted. The email (April 241h ) listing the additional <br />information needed, as summarized in the April 23 d meeting is attached. In order to relieve the reviewer from <br />the tedium of reviewing documentation previously submitted, additional verbiage in this revised application will <br />betyped in Courier New font. <br />
The URL can be used to link to this page
Your browser does not support the video tag.