My WebLink
|
Help
|
About
|
Sign Out
Home
2018.08.06 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2018 CC Packets
>
2018.08.06 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2020 3:08:22 PM
Creation date
8/9/2018 12:00:39 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
8/6/2018
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MWF Properties Frenchman Lofts Sketch Plan <br />Pg. 5 <br />Waste Storage <br />Dumpsters used to hold waste will be stored in the underground parking lot. On designated pick- <br />up days, dumpsters will be wheeled up to the surface to be emptied. Dumpsters will then be <br />placed back into the underground lot. <br />F. Housing/Rental Rates <br />Monthly rental rates will differ between units based on the number of rooms per unit. Rental <br />rates for one bedroom units will be $660-$820 per month. Rates for two -bedroom units will be <br />$950-$1,025 per month and rates for three -bedroom units will be $1,200 per month. <br />G. Grading and Drainage <br />The sketch plan depicts a constructed water filtration basin located on the southeast side of the <br />building. The basin runs almost parallel to the single access road leading to Rosemary Way. The <br />plan also illustrates a 30-foot wetland setback which runs along the north and northwestern section <br />of the site. <br />The 18.15 acre site contains a substantial amount of wetlands. The site will require a wetland <br />delineation to identify the location of the wetland boundary. The applicant will also need to work <br />with the Technical Evaluation Panel (TEP), the City Water Resources Engineer as well as <br />Environmental Scientist to obtain the necessary permits related to the wetland delineation and <br />stormwater management. If the applicant proposed to impact the wetlands, they shall obtain the <br />necessary permits for that as well. <br />Park Dedication <br />The applicant will be required in the amount of $2,400 per unit. The total park dedication for the <br />project will be $108,000. <br />4. CONCLUSION/RECOMMENDATIONS: <br />The MWF Properties staff have done a good job providing and representing a basic sketch plan <br />for the project. There are some items the applicant will need to work on in regards to the <br />architecture. <br />Staff recommends that the Planning Commission provide feedback on the sketch plan to MWF <br />Properties. Below are areas MWF Properties would like feedback on: <br />1. Site Layout <br />2. Architecture <br />
The URL can be used to link to this page
Your browser does not support the video tag.