Laserfiche WebLink
CITY OF HUGO <br />14669 Fitzgerald Avenue North <br />Hugo, MN 55038 <br />Project No. R-010893-000 <br />Pay Voucher No. 1 <br />R-010893-000 Project Material Status <br />Quantity <br />Line <br />Item <br />Description <br />Units <br />Unit Price <br />Contract <br />This <br />Amount This <br />Quantity <br />Amount <br />Quantity <br />Pay <br />Pay Voucher <br />To Date <br />To Date <br />Voucher <br />37 <br />2505.601 <br />UTILITY <br />L S <br />$534.38 <br />1 <br />0.5 <br />$267.19 <br />0.5 <br />$267.19 <br />COORDINATION <br />6" CONCRETE <br />38 <br />2531.504 <br />DRIVEWAY <br />S Y <br />$105.81 <br />50 <br />0 <br />$0.00 <br />0 <br />$0.00 <br />PAVEMENT <br />39 <br />2540.602 <br />MAIL BOX <br />EACH <br />$53.44 <br />4 <br />0 <br />$0.00 <br />0 <br />$0.00 <br />SUPPORT <br />40 <br />2540.602 <br />MAIL BOX <br />EACH <br />$37.41 <br />38 <br />38 <br />$1,421.58 <br />38 <br />$1,421.58 <br />(TEMPORARY) <br />41 <br />2557.602 <br />REPAIR DOG <br />EACH <br />$267.19 <br />4 <br />0 <br />$0.00 <br />0 <br />$0.00 <br />FENCE <br />42 <br />2563.601 <br />TRAFFIC <br />LS <br />$4,221.62 <br />1 <br />0.5 <br />$2,110.81 <br />0.5 <br />$2,110.81 <br />CONTROL <br />STABILIZED <br />43 <br />2573.501 <br />CONSTRUCTION <br />LS <br />$694.70 <br />1 <br />0 <br />$0.00 <br />0 <br />$0.00 <br />EXIT <br />STORM DRAIN <br />44 <br />2573.502 <br />INLET <br />EACH <br />$144.28 <br />8 <br />0 <br />$0.00 <br />0 <br />$0.00 <br />PROTECTION <br />45 <br />2573.503 <br />SILT FENCE; <br />L F <br />$1.34 <br />1500 <br />0 <br />$0.00 <br />0 <br />$0.00 <br />TYPE MS <br />SEDIMENT <br />46 <br />2573.503 <br />CONTROL LOG <br />L F <br />$1.28 <br />4000 <br />0 <br />$0.00 <br />0 <br />$0.00 <br />TYPE WOOD <br />FIBER <br />47 <br />2574.507 <br />LOAM TOPSOIL <br />C Y <br />$39.64 <br />300 <br />0 <br />$0.00 <br />0 <br />$0.00 <br />BORROW <br />48 <br />2575.508 <br />SEED MIXTURE <br />LB <br />$7.47 <br />360 <br />0 <br />$0.00 <br />0 <br />$0.00 <br />25-131 <br />49 <br />2575.508 <br />HYDRAULIC <br />LB <br />$1.44 <br />4000 <br />0 <br />$0.00 <br />0 <br />$0.00 <br />MULCH MATRIX <br />EROSION <br />50 <br />2575.504 <br />CONTROL <br />S Y <br />$2.13 <br />500 <br />0 <br />$0.00 <br />0 <br />$0.00 <br />BLANKETS <br />CATEGORY 3 <br />51 <br />2575.523 <br />WATER <br />MGAL <br />$29.93 <br />250 <br />0 <br />$0.00 <br />0 <br />$0.00 <br />SEEDING (INCL <br />52 <br />2575.604 <br />TOPSOIL & <br />ACRE <br />$2,671.91 <br />1.6 <br />0 <br />$0.00 <br />0 <br />$0.00 <br />FERT) <br />53 <br />2582.503 <br />4" SOLID LINE <br />L F <br />$0.18 <br />9500 <br />0 <br />$0.00 <br />0 <br />$0.00 <br />PAINT <br />54 <br />2582.503 <br />4" DBLE SOLID <br />L F <br />$0.35 <br />11500 <br />0 <br />$0.00 <br />0 <br />$0.00 <br />LINE PAINT <br />55 <br />2582.503 <br />24" SOLID LINE <br />L F <br />$19.87 <br />24 <br />0 <br />$0.00 <br />0 <br />$0.00 <br />PAINT <br />Totals For A. SURFACE IMPROVEMENTS: <br />$375,953.31 <br />$375,953.31 <br />Project Totals: <br />$375,953.31 <br />$375,953.31 <br />Page 5 of 5 <br />