My WebLink
|
Help
|
About
|
Sign Out
Home
2018.11.05 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2018 CC Packets
>
2018.11.05 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2020 2:53:51 PM
Creation date
11/1/2018 3:00:03 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
11/5/2018
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
improvements shall be constructed and installed pursuant to the terms and conditions herein set forth <br />in accordance with the plans approved and listed on Exhibit A, subject to all City Resolutions and <br />approvals listed in Exhibit B, subject to final approval by the City, and in accordance with City <br />standards and requirements including those listed herein. In addition, all public street, utility, and <br />storm drainage improvements shall comply with the City's adopted Specification Book and the <br />direction of City staff. <br />3. Authorization to Proceed with Construction. Developer agrees not to <br />commence any grading, utility or street work within the plat until the following are completed: <br />1) Construction plans are approved by the City and distributed. <br />2) Pre -construction conference is held. <br />3) Notice to Proceed is issued. <br />4. Construction Observation. The City, for its benefit, will provide staff of its <br />choosing to provide construction observation for the public street, utility, and storm drainage <br />improvements outlined in this agreement. All costs associated with construction observation and <br />inspection will be the responsibility of the Developer. The Developer shall allow to the City staff and <br />City consultants access to the property to allow for this work to occur. <br />5. Miscellaneous Requirements. <br />a) Property Corners: All property corners as identified on the plat must <br />be monumented with iron surveyor's pipes by the Developer prior to final project acceptance of the <br />development. <br />b) Drainage Easements: Drainage easements shall be given so as to <br />cover wetlands and stormwater ponding areas based upon 100-year high water levels. <br />c) Soils Testing: Soils inspection and compaction testing by a registered <br />professional engineer shall be accomplished on all lots where filling is required, in accordance with <br />the approved Grading Plan. A minimum of one (1) compaction test for all developed lots shall be <br />obtained for every two (2) foot increment of fill that is placed. A summary of all inspections and <br />compaction tests for all developed lots shall be provided to the City upon completion of the grading. <br />Soil compaction tests shall be provided for respective lot prior to the issuance of a building permit for <br />each respective lot. <br />d) Private Utilities: All utilities, including electricity, telephone, natural <br />gas and cable television, shall be installed underground. <br />e) Mailboxes: Developer shall coordinate mailbox locations with the <br />Postmaster. <br />f) Street Lights: Street lights shall be installed within the plat <br />according to a street lighting plan which will first be approved by the City Engineer. Developer <br />The Preserve on Sunset Lake <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.