Laserfiche WebLink
shall also submit its street lighting plan to the applicable power company for its review, comment <br />and approval. The installation of the street lights shall be coordinated with the applicable power <br />company so that the street light system is installed, constructed and operated in such a manner as <br />will harmoniously exist with other street lights within the area. <br />g) Working Hours: Construction activity, including equipment startup <br />and fueling, can only occur between the hours of 7:00 a.m. and 7:00 p.m. Monday through Friday; <br />8:00 a.m. and 5:00 p.m. on Saturdays; at no time on Sundays or holidays. <br />h) Street Sweeping: Developer shall sweep and/or otherwise clean all <br />streets, as needed, within and adjacent to the Development property as a result of construction <br />activities associated with the plat until final acceptance of the improvements. If the streets are not <br />maintained in a manner acceptable to the City, the City will arrange for the street sweeping at <br />Developer's cost. <br />i) Placement of Bituminous Wear Course: The bituminous wear <br />course can be placed on all streets once all of the following have occurred: <br />l . A Certificate of Occupancy has been issued for at least 75% of <br />the lots or a cash escrow in the amount of $10,000 has been <br />deposit with the City which will be held until 75% of the lots <br />have received Certificates of Occupancy. At the City's <br />discretion, the wear course may be placed prior to having 75% <br />occupancy. If applicable, the warranty period shall be <br />extended an additional one (1) year for a total of two (2) years <br />from final acceptance. In no case shall the wear course be <br />placed with less than 50% occupancy. <br />2. The base course on all streets has been in place for at least one <br />full freeze -thaw cycle. <br />3. City staff or its assignees have visually inspected all roadways <br />and curb within the Development, and any repairs necessary <br />as a result of said inspection are complete and written approval <br />issued. <br />6. Proiect Completion: All work for improvements listed herein on Exhibit A, shall be <br />completed subject to the approval of the City in accordance with the approved plans. All <br />improvements shall be substantially completed to the reasonable satisfaction and approval of the City <br />within twelve (12) months of the execution of this agreement. Substantial completion shall consist <br />of all work with the exception of placement of the bituminous wear course and completion of the final <br />punchlist. The Developer shall be excused from the strict completion date set forth herein if written <br />notice is received from the Developer of the existence of causes over which the Developer has no <br />control which will delay the completion of the work and approved in writing by the City. In that <br />The Preserve on Sunset Lake <br />S <br />