My WebLink
|
Help
|
About
|
Sign Out
Home
PC Packet 04.26.18
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2018 PC Packets
>
PC Packet 04.26.18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2018 10:48:20 AM
Creation date
12/6/2018 2:27:14 PM
Metadata
Fields
Template:
Commissions
Meeting Date
4/26/2018
Document Type
Agenda/Packets
Commission Name
Planning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A <br />WSB <br />�$ AsaOciarer, Inc. <br />April 20, 2018 <br />Ms. Rachel Juba <br />City Planner <br />Infrastructure ■ Engineering ■ Planning ■ Construction <br />City of Hugo <br />14669 Fitzgerald Avenue North <br />Hugo, MN 55038 <br />Re: Final Site Plan Review <br />Schwieters Expansion <br />WSB Project No. 011038-000 <br />Dear Ms. Juba: <br />701 Xenia Avenue South <br />Suite 300 <br />Minneapolis, MN 55416 <br />Tel: 763-541-4800 <br />Fax: 763-541-1700 <br />We have reviewed the final site plan submittal for the above -referenced project. In particular, <br />we have reviewed the following plans related to this particular request: <br />• Schwieters Expansion Project Narrative prepared by AMI Consulting Engineers dated <br />4/10/2018 <br />• Landscape Plans prepared by AMI Consulting Engineers dated 4/10/2018 <br />• Civil Plans prepared by AMI Consulting Engineers dated 4/10/2018 <br />• Architectural Plans by AMI Consulting Engineers dated 4/10/2018 <br />• Lighting Plan by Mlazgar Associates dated 4/10/2018 <br />Based on the review of the site plan, we offer the following comments related to this application: <br />Final Plat <br />1. Provide additional drainage and utility easement for the sanitary sewer (45' wide) <br />extending along the eastern property line to a point 15' past the southernmost manhole. <br />Stormwater Management <br />2. The applicant is proposing to utilize pretreatment ponds, infiltration basins and filtration <br />basins to conform with stormwater management requirements. Treated stormwater is <br />discharged into the wetland complex to the west as well as the storm sewer system along <br />the east side of Fenway Avenue. <br />3. Stormwater management is designed to accommodate this initial phase as well as future <br />buildout phases for the site. <br />4. Required freeboard from groundwater, 100 -year high water levels, and emergency <br />overflow elevations with respect to the lowest floor elevation are met. <br />S:V—IRJuubaWachelIDEVELOPMENTPROJECTSIRoy MaIho, AdditioaWoy Motho, 2nd AdditianlOutlatAlEng Memo Schwieters Expansion -041918.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.