O <br />REGULATORY CONTEXT AND COMPLIANCE: <br />1. TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES FOR THIS PROJECT INCLUDE SILT FENCE, A ROCK CONSTRUCTION ENTRANCE, STORM DRAIN <br />INLET PROTECTION, AND TEMPORARY SEED, MULCH AND SOD, AS NEEDED. <br />2. PERMANENT EROSION AND SEDIMENT CONTROL MEASURES INCLUDE LANDSCAPING, TURF, TURF REINFORCEMENT MAT (TRM) AND RIPRAP. <br />3. PERMANENT STORMWATER BMP'S INCLUDE: INFILTRATION BASINS, WETLANDS, AND STORM SEWER. SEE THE PROJECT SWMP REPORT FOR DETAILS. MAINTAIN <br />BMP'S TO ENSURE PERFORMANCE AND COMPLY WITH MAINTENANCE AS REQUIRED. <br />4. PLACEMENT OF FILL IN WATERS OF THE STATE: THE PROPOSED PROJECT WILL IMPACT WETLANDS. <br />5. THE PROJECT'S STORMWATER DISCHARGE IS NOT SUBJECT TO ADDITIONAL REGULATIONS DUE TO ANY OF THE FOLLOWING: KARST AREAS, DRINKING WATER <br />SUPPLY MANAGEMENT AREA, ENDANGERED OR THREATENED SPECIES, OTHER FORMAL ENVIRONMENTAL REVIEWS. <br />6. THE PROJECT'S STORMWATER DISCHARGE IS NOT ANTICIPATED TO IMPACT ANY OF THE FOLLOWING; OUTSTANDING RESOURCE VALUE WATERS, TROUT <br />WATERS, CALCEROUS FENS, DNR PUBLIC WATERS "WORK IN WATER RESTRICTIONS", PROPERTIES LISTED BY THE NATIONAL REGISTER OF HISTORIC PLACES <br />OR ARCHEOLOGICAL SITES. <br />GENERAL PHASING AND SEQUENCE OF CONSTRUCTION: <br />1. CONTRACTOR AND OWNER SHALL APPLY FOR AND OBTAIN AN NPDES PHASE II PERMIT PRIOR TO BEGINNING CONSTRUCTION. <br />2. TEMPORARY EROSION AND SEDIMENT CONTROLS INCLUDING THE ROCK CONSTRUCTION ENTRANCE, STORM DRAIN INLET PROTECTION AND SILT FENCE <br />SHALL BE INSTALLED PRIOR TO LAND DISTURBING ACTIVITIES IN THE AREAS WHICH THEY PROTECT. <br />3. PERFORM CLEARING AND GRUBBING AND SITE REMOVALS WORK. <br />4. CONSTRUCT THE DETENTION BASIN AND OUTLET FIRST FOR USE DURING CONSTRUCTION. BASIN MAY BE DUG BELOW PLAN DEPTH FOR TEMPORARY <br />SEDIMENT REMOVAL, IF NECESSARY. STABILIZE THE BASIN WITH TEMPORARY SEED. PROTECT THE OUTLET FROM SEDIMENT TO PREVENT SEDIMENT <br />DISCHARGE TO THE WETLAND. CLEAN AND MAINTAIN BASIN THROUGHOUT CONSTRUCTION. <br />5. PERFORM EARTHWORK FOR BUILDING AND PARKING LOT CONSTRUCTION. <br />6. INSTALL WATER, STORM AND SANITARY SEWER. <br />7. PROTECT NEW STORM SEWER INLETS. <br />8. PROVIDE PERMANENT STABILIZATION FOR LAWN AND LANDSCAPED AREAS AS SOON AS POSSIBLE FOLLOWING GRADING. <br />9. FOLLOWING INSTALLATION OF PAVEMENT, REMOVE ALL ACCUMULATED SEDIMENT FROM DETENTION BASINS AND RESTORE PLAN GRADES AND PERMANENTLY <br />STABILIZE THE DISTURBED AREA. <br />10. REMOVE SEDIMENT, CONTAMINANTS AND DEBRIS FROM THE PERMANENT BMPS AFTER PERMANENT STABILIZATION OF THE ENTIRE CONTRIBUTING DRAINAGE <br />AREA. <br />11, SUBMIT NOTICE OF TERMINATION (NOT) TO MPCA WITHIN 30 DAYS OF ACHIEVING FINAL STABILIZATION. <br />EROSION PREVENTION NOTES: <br />1. PHASED CONSTRUCTION SHOULD BE USED TO THE EXTENT PRACTICAL OR AS INDICATED IN THE PLANS TO MINIMIZE EXPOSED SOILS. <br />2. AREAS NOT TO BE DISTURBED SHOULD BE DELINEATED WITH FLAGS, STAKES, SILT FENCE, ETC. PRIOR TO WORK BEGINNING. <br />3. MINIMIZE THE NEED FOR DISTURBANCE OF STEEP SLOPE AREAS AND USE PROPER PHASING AND STABILIZATION PRACTICES (I.E. SLOPE DRAINING AND <br />TERRACING) FOR THOSE AREAS WHICH MUST BE DISTURBED. <br />4. PERFORM ALL EROSION CONTROL PRACTICES AND SEQUENCE CONSTRUCTION IN ACCORDANCE WITH THE METHODS OUTLINED IN THE BEST MANAGEMENT <br />PRACTICES HANDBOOK: "PROTECTING WATER QUALITY IN URBAN AREAS," PUBLISHED BY THE MINNESOTA POLLUTION CONTROL AGENCY. <br />5. INSTALL TEMPORARY EROSION PREVENTION DEVICES AT THE LOCATIONS SHOWN ON THE PLANS PRIOR TO BEGINNING LAND DISTURBING ACTIVITIES. <br />6. MAINTAIN, INSPECT AND REPAIR ALL TEMPORARY EROSION PREVENTION MEASURES IN PLACE UNTIL THE CONTRIBUTING DRAINAGE AREA HAS BEEN <br />STABILIZED. <br />7. PROVIDE ADDITIONAL EROSION CONTROL, WHICH MAY NOT BE SHOWN ON THE DRAWINGS, CONSISTENT WITH THE MEANS, METHODS AND SEQUENCE OF <br />CONSTRUCTION IN ACCORDANCE WITH PERMIT REQUIREMENTS AND AUTHORITIES HAVING JURISDICTION. <br />8. STABILIZE ALL EXPOSED AREAS (INCLUDING STOCKPILES) AGAINST EROSION DUE TO RAIN, WIND AND RUNNING WATER. STABILIZATION MUST BE INITIATED <br />IMMEDIATELY TO LIMIT SOIL EROSION BUT IN NO CASE COMPLETED LATER THAN: <br />FOURTEEN (14) DAYS TO MEET APPENDIX A REQUIREMENTS <br />9. AFTER THE CONSTRUCTION ACTIVITY IN THAT PORTION OF THE SITE HAS TEMPORARILY OR PERMANENTLY CEASED. <br />10. REPAIR ERODED AREAS IMMEDIATELY. <br />11. FOR PUBLIC WATERS WITH DNR "WORK IN WATER RESTRICTIONS" DURING SPECIFIED FISH SPAWNING TIME FRAMES, ALL EXPOSED SOIL AREAS THAT ARE <br />WITHIN 200 FEET OF THE WATER'S EDGE, AND DRAIN TO THESE WATERS MUST COMPLETE THE STABILIZATION ACTIVITIES WITHIN 24 HOURS DURING THE <br />RESTRICTION PERIOD. <br />12. TEMPORARY STOCKPILES WITHOUT SIGNIFICANT SILT, CLAY OR ORGANIC COMPONENTS (I.E. CLEAN AGGREGATE STOCKPILES, DEMOLITION CONCRETE <br />STOCKPILES, SAND STOCKPILES, ETC.) AND THE CONSTRUCTED BASE COMPONENTS OF ROADS, PARKING LOTS AND SIMILAR SURFACES ARE EXEMPT <br />FROM THIS REQUIREMENT BUT MUST BE IN COMPLIANCE WITH PART IV.C.5. <br />13. STABILIZE THE NORMAL WETTED PERIMETER OF ANY TEMPORARY OR PERMANENT DRAINAGE DITCH OR SWALE THAT DRAINS FROM ANY PORTION OF THE <br />CONSTRUCTION SITE, OR DIVERTS WATER AROUND THE SITE, WITHIN 200 LINEAL FEET FROM THE PROPERTY EDGE, OR FROM THE POINT OF DISCHARGE <br />INTO ANY SURFACE WATER. STABILIZATION OF THE LAST 200 LINEAL FEET MUST BE COMPLETED WITHIN 24 HOURS AFTER CONNECTING TO A SURFACE <br />WATER OR PROPERTY EDGE. STABILIZE REMAINING PORTIONS OF DITCHES AND SWALES PER THE ABOVE. <br />14. TEMPORARY OR PERMANENT DITCHES OR SWALES BEING USED AS A SEDIMENT CONTAINMENT SYSTEM (WITH PROPER DITCH CHECKS) DURING <br />CONSTRUCTION DO NOT NEED TO BE STABILIZED DURING THE TEMPORARY PERIOD OF ITS USE AS A SEDIMENT CONTAINMENT SYSTEM. THESE AREAS <br />MUST BE STABILIZED WITHIN 24 HOURS AFTER NO LONGER BEING USED AS A SEDIMENT CONTAINMENT SYSTEM. <br />15. APPLYING MULCH, HYDROMULCH, TACKIFIER, POLYACRYLAMIDE OR SIMILAR EROSION PREVENTION PRACTICES IS NOT ACCEPTABLE STABILIZATION IN ANY <br />PART OF A TEMPORARY OR PERMANENT DRAINAGE DITCH OR SWALE. <br />16. PIPE OUTLETS MUST BE PROVIDED WITH TEMPORARY OR PERMANENT ENERGY DISSIPATION WITHIN 24 HOURS AFTER CONNECTION TO A SURFACE WATER. <br />17. SOD AND/OR SEED, FERTILIZER AND MULCH SHALL BE PLACED AS INDICATED IN THE PLANS AND PROJECT SPECIFICATIONS. SEE LANDSCAPE PLAN(S) <br />FOR LAWN AND LANDSCAPE REQUIREMENTS AND SPECIFICATIONS. <br />18. TEMPORARY STABILIZATION NEEDED TO MEET THE STABILIZATION SCHEDULE SHALL BE AS FOLLOWS: <br />MNDOT MIXTURE 110B MEETING MNDOT SPECIFICATION 3876 PLACED IN ACCORDANCE WITH MNDOT SPECIFICATION 2575 AND TYPE 1 MULCH AT A RATE <br />OF 2 TONS/ACRE SUCH THAT 90% OF THE GROUND IS COVERED WITH DISK ANCHORING MEETING MNDOT SPECIFICATION 3884 UNLESS OTHERWISE <br />SHOWN OR APPROVED. CATEGORY 1, TYPE WOOD FIBER 1S, RD EROSION CONTROL BLANKET IN ACCORDANCE WITH MNDOT SPECIFICATION 3885 MAY <br />ALSO BE USED. <br />19. UTILIZE RAPID STABILIZATION METHODS AS NECESSARY. <br />20. UNLESS INFEASIBLE, DIRECT DISCHARGES FROM BMPS TO VEGETATED AREAS OF THE SITE INCLUDING VELOCITY DISSIPATION DEVICES. <br />21. CONTRACTOR SHALL TAKE ALL STEPS NECESSARY TO PREVENT EXCESS SOIL EROSION. TEMPORARY DEVICES SHALL BE MAINTAINED AND LEFT IN PLACE <br />UNTIL PERMANENT MEASURES ARE IN PLACE. REMOVE TEMPORARY EROSION CONTROL DEVICES AFTER THE ADJACENT FINAL SURFACES ARE PERMANENTLY <br />ESTABLISHED. COORDINATE REMOVAL WITH PERMANENT RESTORATION OF ALL AREAS OCCUPIED BY TEMPORARY DEVICES. <br />22. PROVIDE ADDITIONAL EROSION CONTROL, WHICH MAY NOT BE SHOWN ON THE DRAWINGS, CONSISTENT WITH THE MEANS, METHODS AND SEQUENCE OF <br />CONSTRUCTION IN ACCORDANCE WITH PERMIT REQUIREMENTS AND AUTHORITIES HAVING JURISDICTION. <br />23. MAINTAINING HEALTHY VEGETATION WILL REDUCE THE OCCURRENCE OF EROSION IN LANDSCAPED AREAS. PROMPTLY REPAIR ANY LANDSCAPED AREAS <br />THAT MAY BECOME DAMAGED, AND REPLACE VEGETATION THAT DOES NOT SURVIVE. <br />SEDIMENT CONTROL NOTES: <br />1. EMPLOY SEDIMENT CONTROL PRACTICES AS NECESSARY TO MINIMIZE SEDIMENT FROM ENTERING SURFACE WATERS, INCLUDING CURB AND GUTTER SYSTEMS AND <br />STORM SEWER INLETS. <br />2. INSTALL TEMPORARY SEDIMENT CONTROL DEVICES AT THE LOCATIONS SHOWN ON THE PLANS. PRACTICES MUST BE ESTABLISHED ON ALL DOWN GRADIENT <br />PERIMETERS AND BE LOCATED UPGRADIENT OF ANY BUFFER ZONES. PERIMETER SEDIMENT CONTROL DEVICES MUST BE IN PLACE BEFORE ANY UPGRADIENT <br />LAND -DISTURBING ACTIVITIES BEGIN. THESE DEVICES SHALL REMAIN IN PLACE UNTIL FINAL STABILIZATION HAS BEEN ESTABLISHED. <br />3. RE -INSTALL ALL SEDIMENT CONTROL DEVICES THAT HAVE BEEN ADJUSTED OR REMOVED TO ACCOMMODATE SHORT-TERM ACTIVITIES SUCH AS CLEARING AND <br />GRUBBING, OR PASSAGE OF VEHICLES, IMMEDIATELY AFTER THE SHORT-TERM ACTIVITY HAS BEEN COMPLETED. COMPLETE ANY SHORT-TERM ACTIVITY AS QUICKLY <br />AS POSSIBLE. RE -INSTALL DEVICES BEFORE THE NEXT PRECIPITATION EVENT EVEN IF THE SHORT-TERM ACTIVITY IS NOT COMPLETE. <br />4. ALL STORM DRAIN INLETS MUST BE PROTECTED BY APPROPRIATE BMPS DURING CONSTRUCTION UNTIL ALL SOURCES WITH POTENTIAL FOR DISCHARGING TO THE <br />INLET HAVE BEEN STABILIZED. INLET PROTECTION MAY BE REMOVED FOR A PARTICULAR INLET IF A SPECIFIC SAFETY CONCERN (I.E. STREET FLOODING/FREEZING) <br />HAS BEEN IDENTIFIED. DOCUMENT THE NEED FOR THE REMOVAL IN THE SWPPP. <br />5. TEMPORARY SOIL STOCKPILES MUST HAVE SILT FENCE OR OTHER EFFECTIVE SEDIMENT CONTROLS, AND CANNOT BE PLACED IN ANY NATURAL BUFFERS, SURFACE <br />WATERS, INCLUDING STORMWATER CONVEYANCES SUCH AS CURB AND GUTTER SYSTEMS, OR CONDUITS AND DITCHES UNLESS THERE IS A BYPASS IN PLACE FOR <br />RUNOFF. <br />6. WHERE VEHICLE AND EQUIPMENT TRAFFIC LEAVE THE SITE (OR ONTO PAVED ROADS WITHIN THE SITE): <br />INSTALL A VEHICLE TRACKING BMP TO MINIMIZE TRACK OUT OF SEDIMENT FROM THE ACTIVE CONSTRUCTION SITE. <br />USE STREET SWEEPING IF SUCH VEHICLE TRACKING BMPS ARE NOT ADEQUATE TO PREVENT SEDIMENT FROM BEING TRACKED ONTO PAVEMENTS. <br />7. INSTALL AND MAINTAIN TEMPORARY SEDIMENTATION BASINS AS REQUIRED. <br />8. MINIMIZE SOIL COMPACTION AND, UNLESS INFEASIBLE, PRESERVE TOPSOIL. MINIMIZING COMPACTION IS NOT REQUIRED WHERE THE FUNCTION OF A SPECIFIC AREA <br />OF THE SITE DICTATES THAT IT BE COMPACTED. <br />9. PRESERVE A 50 FOOT NATURAL BUFFER OR (IF A BUFFER IS INFEASIBLE ON THE SITE) PROVIDE REDUNDANT SEDIMENT CONTROLS WHEN A SURFACE WATER IS <br />LOCATED WITHIN 50 FEET OF THE PROJECT'S EARTH DISTURBANCES AND STORMWATER FLOWS TO THE SURFACE WATER. <br />10. IF THE CONTRACTOR INTENDS TO USE POLYMERS, FLOCCULANTS OR OTHER SEDIMENTATION TREATMENT CHEMICALS, COMPLY WITH THE MINIMUM REQUIREMENTS <br />UNDER PERMIT SECTION IV.C.10. <br />11. SOME CONTROL MEASURES SUCH AS DITCH CHECKS AND TEMPORARY SEDIMENT BASINS MAY BE INSTALLED AS GRADING OCCURS IN THE SPECIFIED AREA. <br />MAINTAIN CONTROLS THROUGHOUT THE GRADING PROCESS INCLUDING REESTABLISHING ANY EXISTING CONTROL MEASURES DISTURBED BY CONSTRUCTION. PROVIDE <br />ADDITIONAL SEDIMENT CONTROL, WHICH MAY NOT BE SHOWN ON THE DRAWINGS, CONSISTENT WITH THE MEANS, METHODS AND SEQUENCE OF CONSTRUCTION IN <br />ACCORDANCE WITH PERMIT REQUIREMENTS AND AUTHORITIES HAVING JURISDICTION. <br />INSPECTION AND MAINTENANCE: <br />INSPECT THE ENTIRE CONSTRUCTION SITE AT LEAST ONCE EVERY SEVEN (7) DAYS DURING ACTIVE CONSTRUCTION AND WITHIN 24 HOURS AFTER A RAINFALL EVENT <br />GREATER THAN 0.5 INCHES IN 24 HOURS. FOLLOWING AN INSPECTION THAT OCCURS WITHIN 24 HOURS AFTER A RAINFALL EVENT, THE NEXT INSPECTION MUST BE <br />CONDUCTED WITHIN SEVEN (7) DAYS AFTER THE RAINFALL EVENT. <br />RECORD INSPECTION AND MAINTENANCE IN A LOG KEPT ON-SITE IN ACCORDANCE WITH THE PERMIT REQUIREMENTS. <br />INSPECTIONS MUST BE RECORDED WITHIN 24 HOURS IN WRITING AND BE RETAINED WITH THE SWPPP. RECORDS OF EACH INSPECTION AND MAINTENANCE ACTIVITY <br />SHALL INCLUDE: <br />1. DATE AND TIME OF INSPECTIONS <br />2. NAME OF PERSON(S) CONDUCTING INSPECTIONS <br />3. FINDINGS OF INSPECTIONS, INCLUDING THE SPECIFIC LOCATION WHERE CORRECTIVE ACTIONS ARE NEEDED <br />4. CORRECTIVE ACTIONS TAKEN (INCLUDING DATES, TIMES, AND PARTY COMPLETING MAINTENANCE ACTIVITIES) <br />5. DATE AND AMOUNT OF RAINFALL EVENTS GREATER THAN 0.5 INCHES IN 24 HOURS. RAINFALL AMOUNTS MUST BE OBTAINED BY A PROPERLY MAINTAINED <br />RAIN GAUGE INSTALLED ONSITE, A WEATHER STATION WITHIN 1 MILE OF THE PROJECT LOCATION OR A WEATHER REPORTING SYSTEM THAT PROVIDES SITE <br />SPECIFIC RAINFALL DATA. <br />WHERE PARTS OF THE PROJECT SITE HAVE PERMANENT COVER, BUT WORK REMAINS ON OTHER PARTS OF THE SITE, INSPECTIONS OF THESE AREAS MAY BE REDUCED <br />TO ONCE PER MONTH. <br />WHERE WORK HAS BEEN SUSPENDED DUE TO FROZEN GROUND CONDITIONS, THE INSPECTIONS MAY BE SUSPENDED. THE REQUIRED INSPECTIONS AND MAINTENANCE <br />SCHEDULE MUST BEGIN WITHIN 24 HOURS AFTER RUNOFF OCCURS AT THE SITE OR 24 HOURS PRIOR TO RESUMING CONSTRUCTION, WHICHEVER COMES FIRST. <br />PROVIDE TEMPORARY STABILIZATION AS REQUIRED THROUGHOUT CONSTRUCTION FOR DISTURBED AREAS WHERE ACTIVE CONSTRUCTION IS NOT ONGOING TO MEET PERMIT <br />STABILIZATION SCHEDULE. <br />INSPECT ALL INFILTRATION AREAS TO ENSURE THAT NO SEDIMENT FROM ONGOING CONSTRUCTION ACTIVITY IS REACHING THE INFILTRATION AREA AND EQUIPMENT IS NOT <br />BEING DRIVEN ACROSS THE INFILTRATION AREA. <br />ADDITIONAL CONTROL MEASURES NOT SHOWN ON THE PLAN SHALL BE REQUIRED UNDER THE FOLLOWING CIRCUMSTANCES: <br />6. IF TEMPORARY SOIL STOCKPILES WILL BE BUILT, PERIMETER SILT FENCE WILL BE REQUIRED. <br />7. IF THE CITY OF OTHER AUTHORITY HAVING JURISDICTION REQUIRES ADDITIONAL EROSION CONTROL MEASURES, THE CONTRACTOR SHALL PROVIDE THEM. <br />8. AS THE CONTRACTOR PROCEEDS WITH THE WORK, HE SHALL BE RESPONSIBLE FOR PROVIDING ADDITIONAL EROSION CONTROL MEASURES WHICH MAY BE <br />NECESSARY IN ACCORDANCE WITH THE FINAL MEANS, METHODS AND SEQUENCE OF CONSTRUCTION. <br />9. WHENEVER SWPPP AMENDMENTS ARE NECESSARY PER SECTION III.B. OF THE PERMIT. <br />THE CONTRACTOR SHALL MAINTAIN ALL TEMPORARY MEASURES DURING CONSTRUCTION, AND ENSURE PROPER FUNCTION OF THE PERMANENT MEASURES AT THE TIME OF <br />PROJECT CLOSEOUT. AT A MINIMUM, THIS WORK SHALL INCLUDE THE FOLLOWING: <br />ALL NONFUNCTIONAL BMPS MUST BE REPAIRED, REPLACED OR SUPPLEMENTED WITH FUNCTIONAL BMPS BY THE END OF THE NEXT BUSINESS DAY AFTER DISCOVERY, <br />OR AS SOON AS FIELD CONDITIONS ALLOW ACCESS UNLESS A DIFFERENT TIMEFRAME IS SPECIFIED BELOW. COMPLY WITH THE FOLLOWING INSPECTION AND MAINTENANCE <br />REQUIREMENTS: <br />1. ALL PERIMETER CONTROL (I.E. SILT FENCE, BIOROLL, ETC.) MUST BE REPAIRED, REPLACED OR SUPPLEMENTED WHEN THEY BECOME NONFUNCTIONAL OR <br />THE SEDIMENT REACHES ONE-HALF (1/2) OF THE HEIGHT OF THE DEVICE. <br />2. TEMPORARY AND PERMANENT SEDIMENTATION BASINS MUST BE DRAINED AND THE SEDIMENT REMOVED WHEN THE DEPTH OF SEDIMENT REACHES <br />ONE-HALF (1/2) THE STORAGE VOLUME. DRAINAGE AND REMOVAL MUST BE COMPLETED WITHIN 72 HOURS OF DISCOVERY OR AS SOON AS FIELD CONDITIONS <br />ALLOW. <br />3. SURFACE WATERS, INCLUDING DRAINAGE DITCHES AND CONVEYANCE SYSTEMS, MUST HAVE ALL DELTAS AND SEDIMENT DEPOSITS REMOVED AND ANY <br />EXPOSED SOILS AS A RESULT OF SEDIMENT REMOVAL RESTABILIZED. THE REMOVAL AND STABILIZATION MUST TAKE PLACE WITHIN SEVEN (7) CALENDAR DAYS <br />OF DISCOVERY UNLESS PRECLUDED BY LEGAL, REGULATORY, OR PHYSICAL ACCESS CONSTRAINTS. USE ALL REASONABLE EFFORTS TO OBTAIN ACCESS. IF <br />PRECLUDED, REMOVAL AND STABILIZATION MUST TAKE PLACE WITHIN SEVEN (7) CALENDAR DAYS OF OBTAINING ACCESS. CONTRACTOR IS RESPONSIBLE FOR <br />CONTACTING ALL AUTHORITIES HAVING JURISDICTION AND RECEIVING ANY APPLICABLE PERMITS PRIOR TO CONDUCTING ANY WORK IN SURFACE WATERS. <br />:rya.�nla►raw.�Y•vr��r:�_ty.Jaz•�►rc•»aia.�:t:��:in:�•�►manz•�a>�yrr�y:r_v�:3�:�a►•�•v:l.�.�l� <br />5. THE ROCK CONSTRUCTION ENTRANCE SHALL BE INSPECTED, AND IF THE ROCK IS CLOGGED, THE ROCK AND SEDIMENT SHALL BE REMOVED AND REPLACED <br />WITH CLEAN ROCK. <br />6. STREETS AND OTHER ADJACENT AREAS TO THE PROJECT MUST BE INSPECTED AND HAVE SEDIMENT REMOVED FROM ALL PAVED SURFACES DAILY. <br />7. MAINTAIN PERMANENTLY STABILIZED AREAS UNTIL FULLY ESTABLISHED. <br />8. CLEAN STORM SEWER SYSTEM AT PROJECT COMPLETION. THIS SHALL INCLUDE REMOVING SEDIMENT, DEBRIS AND CONTAMINANTS FROM PERMANENT BMPS <br />AND REMOVING SEDIMENT FROM ALL CATCH BASINS AND PIPES ON SITE. IF SEDIMENT HAS REACHED THE STORM SEWER TO WHICH THE SITE DISCHARGES, <br />THAT SEDIMENT SHALL BE REMOVED AS WELL. <br />0�10LVA 012-11:KMAIs_3Ya:416�y:ra1 1.1�T will 0AmaIsm .11ylrl0owe] rto] 1lezml e•�nIMA �yrr�00ra:31■vaIEel a <br />FINAL STABILIZATION: <br />THE CONTRACTOR MUST ENSURE FINAL STABILIZATION OF THE SITE AND SUBMIT A NOTICE OF TERMINATION (NOT) WITHIN 30 <br />DAYS OF ACHIEVING FINAL STABILIZATION. FINAL STABILIZATION IS COMPLETE WHEN; <br />1. ALL SOIL DISTURBING ACTIVITIES ARE COMPLETE AND ALL SOILS ARE STABILIZED BY A UNIFORM PERENNIAL VEGETATIVE <br />COVER WITH A MINIMUM DENSITY OF 70% ON ALL PERVIOUS AREAS. <br />2. THE PERMANENT STORMWATER MANAGEMENT SYSTEM IS CONSTRUCTED, CLEANED OF ANY ACCUMULATED SEDIMENT AND <br />OPERATING AS DESIGNED AND ALL SEDIMENT HAS BEEN REMOVED FROM CONVEYANCE SYSTEMS AND DITCHES ARE <br />STABILIZED WITH PERMANENT COVER. <br />3. ALL TEMPORARY BMPS HAVE BEEN REMOVED UNLESS THEY ARE DESIGNED TO DECOMPOSE. <br />DEWATERING AND BASIN DRAINING: <br />CONTRACTOR SHALL COMPLY WITH THE FOLLOWING PERMIT REQUIREMENTS: <br />1, DISCHARGE TURBID OR SEDIMENT -LADEN WATERS RELATED TO DEWATERING OR BASIN DRAINING (I.E. PUMPED <br />DISCHARGES, TRENCH/DITCH CUTS FOR DRAINAGE) TO A TEMPORARY OR PERMANENT SEDIMENTATION BASIN. DISCHARGE <br />TO SURFACE WATERS ONLY IF THE BASIN WATER HAS BEEN VISUALLY CHECKED TO ENSURE ADEQUATE TREATMENT HAS <br />BEEN OBTAINED AND THAT NUISANCE CONDITIONS (SEE MINN. R. 7050.0210, SUBP. 2) WILL NOT RESULT FROM THE <br />DISCHARGE. IF WATER CANNON BE DISCHARGED TO A BASIN, IT MUST BE TREATED WITH AN APPROPRIATE BMP SUCH <br />THAT THE DISCHARGE DOES NOT ADVERSELY AFFECT THE RECEIVING WATER OR DOWNSTREAM PROPERTIES. <br />2. WATER THAT CONTAINS OIL OR GREASE MUST USE AN OIL -WATER SEPARATOR OR SUITABLE FILTRATION DEVICE PRIOR TO <br />DISCHARGING THE WATER. <br />3. DISCHARGE POINTS SHALL BE ADEQUATELY PROTECTED FROM EROSION AND SCOUR AND DISCHARGE MUST HAVE BE <br />DISPERSED OVER NATURAL ROCK RIPRAP, SAND BAGS, PLASTIC SHEETING OR OTHER ACCEPTABLE ENERGY DISSIPATION <br />DEVICE. <br />4. ALL WATER FROM DEWATERING OR BASIN -DRAINING ACTIVITIES MUST BE DISCHARGED IN A MANNER THAT DOES NOT <br />CAUSE NUISANCE CONDITIONS, EROSION IN RECEIVING CHANNELS OR ON DOWNSLOPE PROPERTIES, OR INUNDATION IN <br />WETLANDS CAUSING SIGNIFICANT ADVERSE IMPACTS TO THE WETLAND. <br />5. BACKWASH WATER FROM USING FILTERS MUST BE HAULED OFFSITE AND DISPOSED OF IN A LEGAL MANNER, RETURNED <br />TO THE BEGINNING OF THE TREATMENT PROCESS OR INCORPORATED INTO THE SITE IN A MANNER THAT DOES NOT <br />CAUSE EROSION. BACKWASH WATER MAY BE DISCHARGED TO SANITARY SEWER IF PERMISSION (IN WRITING) IS GRANTED <br />BY THE SANITARY SEWER AUTHORITY. REPLACE AND CLEAN THE FILTER MEDIA USED IN DEWATERING DEVICES WHEN <br />REQUIRED TO RETAIN ADEQUATE FUNCTION. <br />POLLUTION PREVENTION: <br />EXPECTED SOURCES OF POTENTIAL STORM WATER POLLUTANTS ON THE SITE OTHER THAN SOIL INCLUDE, BUT ARE NOT <br />LIMITED TO, THOSE LISTED BELOW. THE CONTRACTOR SHALL IMPLEMENT THE FOLLOWING POLLUTION PREVENTION MANAGEMENT <br />MEASURES ON THE SITE; <br />1. STORAGE, HANDLING AND DISPOSAL OF CONSTRUCTION PRODUCTS, MATERIALS AND WASTES SHALL COMPLY WITH THE <br />FOLLOWING TO MINIMIZE THE EXPOSURE TO STORMWATER: <br />2. BUILDING PRODUCTS THAT HAVE THE POTENTIAL TO LEACH POLLUTANTS MUST BE UNDER COVER (I.E.) PLASTIC <br />SHEETING OR TEMPORARY ROOFS) TO PREVENT THE DISCHARGE OF POLLUTANTS OR PROTECTED BY A SIMILARLY <br />EFFECTIVE MEANS DESIGNED TO MINIMIZE CONTACT WITH STORMWATER RUNOFF. <br />3, PESTICIDES, HERBICIDES, INSECTICIDES, FERTILIZERS, TREATMENT CHEMICALS AND LANDSCAPE MATERIALS MUST BE <br />UNDER COVER TO PREVENT THE DISCHARGE OF POLLUTANTS OR PROTECTED BY A SIMILARLY EFFECTIVE MEANS <br />DESIGNED TO MINIMIZE CONTACT WITH STORMWATER RUNOFF, <br />4. HAZARDOUS MATERIALS, TOXIC WASTE (INCLUDING OIL, DIESEL FUEL, GASOLINE, HYDRAULIC FLUIDS, PAINT SOLVENTS, <br />PETROLEUM-BASED PRODUCTS, WOOD PRESERVATIVES, ADDITIVES, CURING COMPOUNDS, AND ACIDS) MUST BE PROPERLY <br />STORED IN SEALED AND LABELED CONTAINERS TO PREVENT SPILLS, LEAKS OR OTHER DISCHARGE. RESTRICTED ACCESS <br />STORAGE MUST BE PROVIDED TO PREVENT VANDALISM. STORAGE AND DISPOSAL OF HAZARDOUS WASTE OR HAZARDOUS <br />MATERIALS MUST BE IN COMPLIANCE WITH MINN. R. CH. 7045 INCLUDING SECONDARY CONTAINMENT AS <br />APPLICABLE. <br />5. SOLID WASTE MUST BE STORED, COLLECTED AND DISPOSED OF PROPERLY IN COMPLIANCE WITH MINN. R. CH. 7035. <br />6. PORTABLE TOILETS MUST BE POSITIONED SO THAT THEY ARE SECURE AND WILL NOT BE TIPPED OR KNOCKED OVER. <br />SANITARY WASTE MUST BE DISPOSED OF PROPERLY IN ACCORDANCE WITH MINN. R. CH. 7041. <br />7. FUELING AND MAINTENANCE OF EQUIPMENT AND VEHICLES:; SPILL PREVENTION AND RESPONSE: TAKE REASONABLE <br />STEPS TO PREVENT THE DISCHARGE OF SPILLED OR LEAKED CHEMICALS, INCLUDING FUEL, FROM ANY AREA WHERE <br />CHEMICALS OR FUEL LOADING OR UNLADING INCLUDING THE USE OF DRIP PANS OR ABSORBENTS. CONDUCT FUELING IN <br />A CONTAINED AREA AND ENSURE ADEQUATE SUPPLIES ARE AVAILABLE AT ALL TIMES TO CLEAN UP DISCHARGED <br />MATERIALS AND THAT AN APPROPRIATE DISPOSAL METHOD IS AVAILABLE FOR RECOVERED SPILLED MATERIALS. REPORT <br />AND CLEAN UP SPILLS IMMEDIATELY AS REQUIRED BY MINN. STAT. §1 15.061 , USING DRY CLEAN UP MEASURES WHERE <br />POSSIBLE. <br />8. VEHICLE AND EQUIPMENT WASHING: WASHING MUST BE LIMITED TO A DEFINED AREA OF THE SITE WITH RUNOFF FROM <br />THE WASHING AREA CONTAINED IN A SEDIMENT BASIN OR OTHER SIMILARLY EFFECTIVE CONTROL AND WASTE PROPERLY <br />DISPOSED OF. <br />9. CONCRETE AND OTHER WASHOUTS WASTE: PROVIDE EFFECTIVE CONTAINMENT FOR ALL LIQUID AND SOLID WASTES <br />GENERATED BY WASHOUT OPERATIONS (CONCRETE, STUCCO, PAINT, FORM RELEASE OILS, CURING COMPOUNDS, AND <br />OTHER CONSTRUCTION MATERIALS). LIQUID AND SOLID WASHOUT WASTES MUST NOT CONTACT THE GROUND, AND THE <br />CONTAINMENT MUST BE DESIGNED SO THAT IT DOES NOT RESULT IN RUNOFF FROM THE WASHOUT OPERATIONS OR <br />AREAS. LIQUID AND SOLID WASTES MUST BE DISPOSED OF PROPERLY, IN A LEGAL MANNER AND IN COMPLIANCE WITH <br />MPCA RULES. A SIGN MUST BE INSTALLED ADJACENT TO EACH WASHOUT FACILITY THAT REQUIRES SITE PERSONNEL TO <br />UTILIZE THE PROPER FACILITIES FOR DISPOSAL OF CONCRETE AND OTHER WASHOUT WASTES. <br />10. THE CONTRACTOR IS RESPONSIBLE FOR MONITORING AIR POLLUTION AND ENSURING IT DOES NOT EXCEED LEVELS SET <br />BY LOCAL, STATE OR FEDERAL REGULATIONS. THIS INCLUDES DUST CREATED BY WORK BEING PERFORMED ON THE SITE. <br />TRAINING DOCUMENTATION: <br />THE CONTRACTOR SHALL SUBMIT THE TRAINING DOCUMENTATION PER MNDOT SPECIFICATION 31 25 00 SHOWING COMPLIANCE <br />WITH SECTION III.F. OF THE PERMIT. INDIVIDUALS THAT MUST BE TRAINED INCLUDE: <br />1. INDIVIDUALS PREPARING THE SWPPP (ENGINEER). <br />2. INDIVIDUALS OVERSEEING IMPLEMENTATION OF, REVISING, AND AMENDING THE SWPPP AND PERFORMING INSPECTIONS <br />(SWPPP COORDINATOR). ONE OF THESE INDIVIDUALS MUST BE AVAILABLE FOR AN ONSITE INSPECTION WITHIN 72 HOURS <br />UPON REQUEST BY THE MPCA. <br />3. INDIVIDUALS PERFORMING OR SUPERVISING THE INSTALLATION, MAINTENANCE AND REPAIR OF BMPS MUST BE TRAINED IN <br />THESE JOB DUTIES. <br />TRAINING CONTENT AND EXTENT MUST BE COMMENSURATE WITH THE INDIVIDUAL'S JOB DUTIES AND RESPONSIBILITIES. <br />INDIVIDUALS MUST BE TRAINED BY LOCAL, STATE, FEDERAL AGENCIES, PROFESSIONAL ORGANIZATIONS, OR OTHER ENTITIES WITH <br />EXPERTISE IN EROSION PREVENTION, SEDIMENT CONTROL, PERMANENT STORMWATER MANAGEMENT AND THE MINNESOTA <br />NPDES/SDS CONSTRUCTION STORMWATER PERMIT. <br />0 <br />Q =N E <br />• cD o <br />U <br />W <br />L w <br />N Z <br />Z <br />0 cZ <br />• < 0 <br />Lu <br />U oC <br />° � <br />Lu <br />O <br />Ln _ <br />(D fV <br />}, Qo)w <br />wrrnZ) <br />' <br />cn QmN <br />O O u1 <br />U 1O <br />m <br />z r Lu <br />O =10 <br />Q w r a <br />U p � w <br />-z 0 <br />v <br />�=�oz <br />Ute¢= <br />Lu0<L <br />V <br />Qw <br />r < <br />m <br />h in ~ Z <br />Lu <br />C O~ Q Z <br />� <br />Qw O <br />F_ <br />Lu > <br />af Lu <br />afLu <br />Lu CL <br />CO <br />Lu <br />U <br />Lu <br />�9�UQ :mm) <br />O o J <br />W Q <br />� z <br />ui <br />Q <br />o <br />r <br />m <br />w <br />z <br />O <br />IL <br />iY <br />U <br />V) <br />w <br />D <br />Lu <br />w <br />Q <br />0 <br />r <br />Z � <br />0 vi <br />cn w_ Q) <br />Z ~ <br />Q w Q <br />w <br />0 <br />o <br />Lu <br />Z <br />� Z C7 <br />r <br />Lu <br />= <br />w <br />LJ Q <br />j w w <br />cn <br />C) <br />m <br />U Q <br />= <br />U <br />cn <br />JOB No: 171316 <br />DATE: 04/10/2018 <br />DRAWN BY: Cio <br />DESIGNED BY: ECR <br />SHEET: <br />C601 <br />