Laserfiche WebLink
CD <br />0 <br />a <br />w <br />Z <br />0 <br />Z <br />w <br />0 <br />z <br />0 <br />v <br />Q <br />0 <br />a <br />O <br />U <br />0 <br />RECORD RETENTION: <br />THE SWPPP, INCLUDING, ALL CHANGES TO IT, PERMITS, AND INSPECTION AND MAINTENANCE RECORDS MUST BE KEPT <br />AT THE SITE DURING CONSTRUCTION. THE SWPPP CAN BE KEPT IN EITHER THE FIELD OFFICE OR IN AN ON-SITE <br />VEHICLE DURING NORMAL WORKING HOURS. THE OWNER MUST KEEP THE FOLLOWING RECORDS ON FILE FOR THREE (3) <br />YEARS AFTER SUBMITTAL OF THE NOT: <br />1. THE FINAL SWPPP. <br />2. ANY OTHER STORMWATER RELATED PERMITS REQUIRED FOR THE PROJECT. <br />3. RECORDS OF ALL INSPECTION AND MAINTENANCE CONDUCTED DURING CONSTRUCTION. <br />4. ALL PERMANENT OPERATION AND MAINTENANCE AGREEMENTS THAT HAVE BEEN IMPLEMENTED, INCLUDING ALL <br />RIGHT-OF-WAY, CONTRACTS, COVENANTS AND OTHER BINDING REQUIREMENTS REGARDING PERPETUAL <br />MAINTENANCE. <br />5. ALL REQUIRED CALCULATIONS FOR DESIGN OF THE TEMPORARY AND PERMANENT STORMWATER MANAGEMENT <br />SYSTEMS. <br />SWPPP AMENDMENTS: <br />THE PERMITTEE MUST AMEND THE SWPPP AS NECESSARY TO INCLUDE ADDITIONAL REQUIREMENTS THAT ARE DESIGNED <br />TO CORRECT PROBLEMS IDENTIFIED OR TO ADDRESS ANY OF THE FOLLOWING SITUATIONS: <br />1. THERE IS A CHANGE IN DESIGN, CONSTRUCTION, OPERATION, MAINTENANCE, WEATHER OR SEASONAL CONDITIONS <br />THAT HAVE A SIGNIFICANT EFFECT ON THE STORMWATER DISCHARGE. <br />2. INSPECTION OR INVESTIGATION BY A PARTY (SWPPP COORDINATOR, INSPECTORS, SITE OPERATOR, LOCAL, STATE <br />OR FEDERAL OFFICIALS) INDICATES THE SWPPP IS NOT EFFECTIVE. <br />3. THE SWPPP IS NOT ACHIEVING THE GENERAL OBJECTIVES OF MINIMIZING POLLUTANTS IN STORMWATER <br />DISCHARGES OR THE SWPPP IS DEEMED TO BE NOT CONSISTENT WITH THE TERMS AND CONDITIONS OF THE <br />PERMIT. <br />4. THE MPCA DETERMINES THAT DISCHARGE MAY CAUSE OR CONTRIBUTE TO NON -ATTAINMENT OF ANY APPLICABLE <br />WATER QUALITY STANDARDS OR THE SWPPP DOES NOT INCORPORATE THE REQUIREMENTS RELATED TO AN <br />IMPAIRED WATERS OR APPROVED TMDL. <br />ESTIMATED QUANTITIES <br />BMP <br />UNIT <br />QUANTITY <br />SILT FENCE <br />LF <br />2577 <br />BIOROLL <br />LE <br />800 <br />STORM DRAIN INLET PROTECTION <br />EA <br />22 <br />ROCK CONSTRUCTION ENTRANCE <br />EA <br />1 <br />WET BASIN SEED <br />AC <br />1.01 <br />EROSION CONTROL BLANKET <br />AC <br />2.85 <br />LANDSCAPING <br />AC <br />6.50 <br />Know what's below. <br />0111 before you dig. <br />STATE LAW: 48 HOURS BEFORE EXCAVATING OR <br />DEMOLISHING BUILDINGS, CALL 811 FOR FIELD LOCATION <br />OF UNDERGROUND UTILITY LINES. THIS SERVICE LOCATES <br />UTILITY OWNED LINES BUT NOT PRIVATE LINES. <br />THE LOCATIONS OF UNDERGROUND UTILITIES ARE SHOWN <br />IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN <br />INDEPENDENTLY VERIFIED. THE EXACT LOCATION OF ALL <br />UTILITIES (PUBLIC AND PRIVATE) MUST BE DETERMINED <br />BEFORE COMMENCING WORK. <br />._q <br />61 I <br />"1'' <br />_s,4NEXA'+ <br />Hbgdv <br />LU <br />11 J1, <br />1,k. <br />,'D[ <br />I SITE <br />- •� t r _ I — <br />t <br />-,4 <br />� Iyy I.- 4 <br />. 6P 633' <br />N <br />USGS MAP <br />NOT TO SCALE <br />GEOTEXTILE ' <br />6" MINIMUM DEPTH <br />2"-3" WASHED ROCK <br />18" MINIMUM HEIGHT <br />IF DRAINAGE FLOWS <br />TOWARD ROAD <br />50' MIN. <br />)0 <br />0O�O <br />Q, 00 000000 <br />\,r 0 O <br />p <br />20 MIN. <br />NOTES. <br />1. GEOTEXTILE SHALL BE PLACED UNDER ROCK TO STOP MUD <br />MIGRATION THROUGH ROCK <br />2. OTHER METHODS BESIDES ROCK (SLASH MULCH, RUMBLE PAD, <br />ETC.) MAY BE USED FOR EXIT STABILIZATION WITH ENGINEER <br />APPROVAL <br />3. SEE EROSION CONTROL PLAN OR SWPPP FOR MAINTENANCE. <br />6001 ROCK CONSTRUCTION ENTRANCE <br />NOT TO SCALE <br />- <br />I ti b I <br />t% '. <br />4 <br />-1 4SA- <br />C'3 RL <br />FLOW <br />BACKFILL AND COMPACT <br />SOIL FROM TRENCH <br />PLACE IN SHALLOW <br />TRENCH 1-2" OF DEPTH <br />8"-10" <br />1"x2"x24" LONG WOOD STAKES AT 2' MAX <br />SPACING. DRIVE THROUGH BACK HALF OF <br />SEDIMENT CONTROL LOG AT 45° ANGLE <br />WITH THE TOP OF THE STAKE POINTING <br />UPSTREAM. <br />DETAIL FOR TYPES: STRAW, WOOD FIBER OR COIR <br />NOT FOR USE ON HARD SURFACES <br />1"x2"x18" LONG WOOD STAKES AS NEEDED. <br />DRIVE OVER LOG AT 45° ANGLE WITH THE <br />TOP OF THE STAKE POINTING UPSTREAM. <br />PROVIDE 8-10" OF EMBEDMENT DEPTH. <br />DETAIL FOR TYPES: WOOD CHIP, COMPOST OR ROCK <br />MAY BE USED ON HARD SURFACES. NO STAKES IF SHOWN ON HARD SURFACES <br />NOTES: <br />1. SPACE BETWEEN STAKES SHALL BE A MAXIMUM OF 1 FOOT FOR DITCH CHECKS OR 2 FEET FOR OTHER APPLICATIONS. <br />2. PLACE STAKES AS NEEDED TO PREVENT MOVEMENT OF SEDIMENT CONTROL LOGS PLACED ON SLOPES OR AS NEEDED DUE <br />TO OTHER FACTORS. STAKES SHALL BE INCIDENTAL. <br />3. FOR PERMANENT DITCH CHECK REDUCE THE HEIGHT TO 16 IN. AND MODIFY THE 1:2 (V: h) SIDE SLOPE TO 1:6 (V: H). <br />4. TO BE USED FOR CRITICAL PERIMETER CONTROL AREAS WHERE STANDING WATER OCCURS (6 INCH MAX. DEPTH). BALES <br />SHALL CONSIST OF TYPE 1 MULCH OF APPROXIMATELY 14 IN. X 18 IN. X 36 IN. LONG. BALES SHALL BE PLACED ON EDGE <br />AND BUTTED TIGHT TO ADJACENT BALES. <br />5. INSTEAD OF TRENCHING, PLACE BALE ON THE BLANKET AND WRAP BLANKET AROUND THE BALE. PLACE STAKE THROUGH <br />BALE AND BLANKET. <br />Ls <br />r _ _j -- <br />} <br />1 <br />I <br />! <br />10- - 3/16" THICK (MIN.) <br />J_ I_ STEEL COVER <br />Li <br />• —- . <br />I 6" DIAMETER <br />POLYETHYLENE <br />RECEIVING WATERS: D-2» <br />CLEARWATER CREEK <br />IMPAIRED: AOL <br />2" SQUARE SHARPENED WOOD <br />POST @ 6' MAX. SPACING OR <br />AS REQUIRED BY GOVERNING <br />SPECIFICATIONS <br />APPROVED GEOTEXTILE FABRIC <br />(36" WIDTH) <br />LAY FABRIC IN TRENCH <br />BACKFILL OVER THE TOP OF <br />FABRIC & COMPACT THE SOIL <br />OR MACHINE SLICE 8"-12" <br />DEEP (PLUS 6" FLAP) <br />FABRIC SECURELY <br />FASTENED TO POST <br />30" MIN. <br />HEIGHT <br />GRADE <br />i <br />111-7 <br />— <br />6" III, ;III= <br />24" MIN. — <br />DEPTH <br />,1 <br />NOTES: <br />1. POST SPACING SHALL NOT EXCEED 6 FEET. <br />2. POST TO BE ON LOWER SIDE OF SLOPE (TOWARD PROPERTY BOUNDARY OR <br />POND SIDE) AND FENCE UPSTREAM. <br />3. GEOTEXTILE FABRIC SHALL BE "MIRAFI" TYPE OR APPROVED EQUAL. <br />4. TRENCH SHALL BE A MIN. OF 6 INCHES DEEP BY 6 INCHES WIDE. <br />5. MACHINE SLICED METHOD IS ACCEPTABLE <br />6. SEE EROSION CONTROL PLAN OR SWPPP FOR REPAIR AND MAINTENANCE. <br />6011 SILT FENCE <br />NOT TO SCALE <br />TUBE RISER <br />VIII a° <br />�IIII e <br />6041 BIOROLL LOG <br />NOT TO SCALE <br />o <br />O <br />O 11\ 2-1/2" 2•-0" <br />O <br />— 2" <br />TUBE <br />RISER ADJUST LEVEL OF FILTER <br />SOCK TO BE BELOW ROAD <br />�— SURFACE ELEV. <br />FILTER SOCK <br />POP—UP HEAD <br />SECTION <br />(UP POSITION) <br />14.75" RADIUS <br />3/1E <br />STEEL PLATE <br />DIAMETER <br />PERSPECTIVE VIEW <br />3/16" THICK (MIN.) <br />ATE <br />SECTION <br />(DOWN POSITION) <br />ENDS SECURELY CLOSED TO PREVENT LOS <br />TYPE 9 MU CH OF OPEN GRADED AGGREGATE FILL. <br />GROUND LI SECURED WITH 50 PSI. ZIP TIE. <br />loO0000000000000000 12" <br />00 � <br />0 <br />CATCH BASIN/ <br />FLANGE MANHOLE <br />BUTT JOINTS <br />SEDIMENT CONTROL INLET HAT ROCK LOG/COMPOST LOG <br />NOTES: <br />1. THE SEDIMENT CONTROL BARRIER SHALL BE A METAL OR PLASTIC/POLYETHYLENE RISER SIZED <br />TO FIT INSIDE THE CATCH BASIN/MANHOLE: HAVE PERFORATIONS TO ALLOW FOR WATER <br />INFILTRATION: HAVE AN OVERFLOW OPENING, FLANGES AND A LID/COVER. <br />2. MANUFACTURED ALTERNATIVES LISTED ON MNDOT'S APPROVED PRODUCTS LIST MAY BE <br />SUBSTITUTED. <br />3. SOCK HEIGHT MUST NOT BE SO HIGH AS TO SLOW DOWN WATER FILTRATION TO CAUSE FLOODING <br />OF THE ROADWAY. <br />4. GEOTEXTILE SOCK BETWEEN 4-10 FEET LONG AND 4-6 INCH DIAMTER. SEAM TO BE JOINED BY <br />TWO ROWS OF STITCHING WITH A PLASTIC MESH BACKING OR PROVIDE A HEAT BONDED SEAM <br />(OR APPROVED EQUIVALENT). FILL ROCK LOG WITH OPEN GRADED CONFORMING TO SPEC. 3137 <br />TABLE 3137-1; CA -3 GRADATION. <br />6051 INLET PROTECTION <br />NOT TO SCALE <br />N <br />PvgV/ c <br />GEOTEXTILE ' <br />6" MINIMUM DEPTH <br />2"-3" WASHED ROCK <br />18" MINIMUM HEIGHT <br />IF DRAINAGE FLOWS <br />TOWARD ROAD <br />50' MIN. <br />)0 <br />0O�O <br />Q, 00 000000 <br />\,r 0 O <br />p <br />20 MIN. <br />NOTES. <br />1. GEOTEXTILE SHALL BE PLACED UNDER ROCK TO STOP MUD <br />MIGRATION THROUGH ROCK <br />2. OTHER METHODS BESIDES ROCK (SLASH MULCH, RUMBLE PAD, <br />ETC.) MAY BE USED FOR EXIT STABILIZATION WITH ENGINEER <br />APPROVAL <br />3. SEE EROSION CONTROL PLAN OR SWPPP FOR MAINTENANCE. <br />6001 ROCK CONSTRUCTION ENTRANCE <br />NOT TO SCALE <br />- <br />I ti b I <br />t% '. <br />4 <br />-1 4SA- <br />C'3 RL <br />FLOW <br />BACKFILL AND COMPACT <br />SOIL FROM TRENCH <br />PLACE IN SHALLOW <br />TRENCH 1-2" OF DEPTH <br />8"-10" <br />1"x2"x24" LONG WOOD STAKES AT 2' MAX <br />SPACING. DRIVE THROUGH BACK HALF OF <br />SEDIMENT CONTROL LOG AT 45° ANGLE <br />WITH THE TOP OF THE STAKE POINTING <br />UPSTREAM. <br />DETAIL FOR TYPES: STRAW, WOOD FIBER OR COIR <br />NOT FOR USE ON HARD SURFACES <br />1"x2"x18" LONG WOOD STAKES AS NEEDED. <br />DRIVE OVER LOG AT 45° ANGLE WITH THE <br />TOP OF THE STAKE POINTING UPSTREAM. <br />PROVIDE 8-10" OF EMBEDMENT DEPTH. <br />DETAIL FOR TYPES: WOOD CHIP, COMPOST OR ROCK <br />MAY BE USED ON HARD SURFACES. NO STAKES IF SHOWN ON HARD SURFACES <br />NOTES: <br />1. SPACE BETWEEN STAKES SHALL BE A MAXIMUM OF 1 FOOT FOR DITCH CHECKS OR 2 FEET FOR OTHER APPLICATIONS. <br />2. PLACE STAKES AS NEEDED TO PREVENT MOVEMENT OF SEDIMENT CONTROL LOGS PLACED ON SLOPES OR AS NEEDED DUE <br />TO OTHER FACTORS. STAKES SHALL BE INCIDENTAL. <br />3. FOR PERMANENT DITCH CHECK REDUCE THE HEIGHT TO 16 IN. AND MODIFY THE 1:2 (V: h) SIDE SLOPE TO 1:6 (V: H). <br />4. TO BE USED FOR CRITICAL PERIMETER CONTROL AREAS WHERE STANDING WATER OCCURS (6 INCH MAX. DEPTH). BALES <br />SHALL CONSIST OF TYPE 1 MULCH OF APPROXIMATELY 14 IN. X 18 IN. X 36 IN. LONG. BALES SHALL BE PLACED ON EDGE <br />AND BUTTED TIGHT TO ADJACENT BALES. <br />5. INSTEAD OF TRENCHING, PLACE BALE ON THE BLANKET AND WRAP BLANKET AROUND THE BALE. PLACE STAKE THROUGH <br />BALE AND BLANKET. <br />Ls <br />r _ _j -- <br />} <br />1 <br />I <br />! <br />10- - 3/16" THICK (MIN.) <br />J_ I_ STEEL COVER <br />Li <br />• —- . <br />I 6" DIAMETER <br />POLYETHYLENE <br />RECEIVING WATERS: D-2» <br />CLEARWATER CREEK <br />IMPAIRED: AOL <br />2" SQUARE SHARPENED WOOD <br />POST @ 6' MAX. SPACING OR <br />AS REQUIRED BY GOVERNING <br />SPECIFICATIONS <br />APPROVED GEOTEXTILE FABRIC <br />(36" WIDTH) <br />LAY FABRIC IN TRENCH <br />BACKFILL OVER THE TOP OF <br />FABRIC & COMPACT THE SOIL <br />OR MACHINE SLICE 8"-12" <br />DEEP (PLUS 6" FLAP) <br />FABRIC SECURELY <br />FASTENED TO POST <br />30" MIN. <br />HEIGHT <br />GRADE <br />i <br />111-7 <br />— <br />6" III, ;III= <br />24" MIN. — <br />DEPTH <br />,1 <br />NOTES: <br />1. POST SPACING SHALL NOT EXCEED 6 FEET. <br />2. POST TO BE ON LOWER SIDE OF SLOPE (TOWARD PROPERTY BOUNDARY OR <br />POND SIDE) AND FENCE UPSTREAM. <br />3. GEOTEXTILE FABRIC SHALL BE "MIRAFI" TYPE OR APPROVED EQUAL. <br />4. TRENCH SHALL BE A MIN. OF 6 INCHES DEEP BY 6 INCHES WIDE. <br />5. MACHINE SLICED METHOD IS ACCEPTABLE <br />6. SEE EROSION CONTROL PLAN OR SWPPP FOR REPAIR AND MAINTENANCE. <br />6011 SILT FENCE <br />NOT TO SCALE <br />TUBE RISER <br />VIII a° <br />�IIII e <br />6041 BIOROLL LOG <br />NOT TO SCALE <br />o <br />O <br />O 11\ 2-1/2" 2•-0" <br />O <br />— 2" <br />TUBE <br />RISER ADJUST LEVEL OF FILTER <br />SOCK TO BE BELOW ROAD <br />�— SURFACE ELEV. <br />FILTER SOCK <br />POP—UP HEAD <br />SECTION <br />(UP POSITION) <br />14.75" RADIUS <br />3/1E <br />STEEL PLATE <br />DIAMETER <br />PERSPECTIVE VIEW <br />3/16" THICK (MIN.) <br />ATE <br />SECTION <br />(DOWN POSITION) <br />ENDS SECURELY CLOSED TO PREVENT LOS <br />TYPE 9 MU CH OF OPEN GRADED AGGREGATE FILL. <br />GROUND LI SECURED WITH 50 PSI. ZIP TIE. <br />loO0000000000000000 12" <br />00 � <br />0 <br />CATCH BASIN/ <br />FLANGE MANHOLE <br />BUTT JOINTS <br />SEDIMENT CONTROL INLET HAT ROCK LOG/COMPOST LOG <br />NOTES: <br />1. THE SEDIMENT CONTROL BARRIER SHALL BE A METAL OR PLASTIC/POLYETHYLENE RISER SIZED <br />TO FIT INSIDE THE CATCH BASIN/MANHOLE: HAVE PERFORATIONS TO ALLOW FOR WATER <br />INFILTRATION: HAVE AN OVERFLOW OPENING, FLANGES AND A LID/COVER. <br />2. MANUFACTURED ALTERNATIVES LISTED ON MNDOT'S APPROVED PRODUCTS LIST MAY BE <br />SUBSTITUTED. <br />3. SOCK HEIGHT MUST NOT BE SO HIGH AS TO SLOW DOWN WATER FILTRATION TO CAUSE FLOODING <br />OF THE ROADWAY. <br />4. GEOTEXTILE SOCK BETWEEN 4-10 FEET LONG AND 4-6 INCH DIAMTER. SEAM TO BE JOINED BY <br />TWO ROWS OF STITCHING WITH A PLASTIC MESH BACKING OR PROVIDE A HEAT BONDED SEAM <br />(OR APPROVED EQUIVALENT). FILL ROCK LOG WITH OPEN GRADED CONFORMING TO SPEC. 3137 <br />TABLE 3137-1; CA -3 GRADATION. <br />6051 INLET PROTECTION <br />NOT TO SCALE <br />N <br />Q = E <br />• (D o <br />U <br />W <br />cn = L w <br />L Ln Qr z <br />Z <br />Z <br />O <br />> <br />E <br />W cr- ra ' <br />U ' <br />b-0 Ln <br />w <br />0 <br />C: (D cV off <br />a --i Q dl w <br />_ d <br />Jm <br />cn QmN <br />c:H r -I <br />p O In <br />U ( 10 <br />m <br />r <br />Z w <br />QLU >-0:� <br />U p::Dw <br />i �p <br />p Z <br />11'�Q= <br />LWU <br />V) LU <br />`� w Q <br />Q�~ <br />Q W <br />J m <br />N LU z <br />w — <br />_ <br />< OQ z <br />w <br />Q w O <br />P N <br />� _LL <br />LU > <br />L <br />Dof w <br />LU CL <br />CLO <br />w <br />U <br />LU w <br />cj�afU <br />Op�� <br />z <br />C� <br />N <br />r <br />LU <br />z <br />O <br />I- <br />IL <br />V) <br />W <br />p <br />W <br />W <br />H <br />Q <br />0 <br />z <br />O cn <br /><n W_ r <br />Z ~ J <br />W ¢ <br />L/3Q <br />J <br />r r -1Z <br />>G N <br />O <br />Q <br />LU =D <br />D O <br />w <br />0 <br />I <br />_ <br />�_ r^ -j/ Z <br />1 L CD = <br />r <br />W W< <br />j w w <br />p <br />m <br />U Q <br />= <br />U <br />t/7 <br />JOB No: 171316 <br />DATE: 04/10/2018 <br />DRAWN BY: CJO <br />DESIGNED BY: ECR <br />SHEET: <br />C602 <br />