Laserfiche WebLink
H. Garages and Garage Doors <br /> It is strongly encouraged that garages are positioned to reduce their visual impact on the street. <br /> This includes keeping the face of the garage in line with the balance of the home, or behind the <br /> balance of the front of the home when possible. Exaggerated forward garage construction is <br /> strongly discouraged. <br /> I. Driveways <br /> Asphalt, concrete, exposed aggregate concrete, or pavers shall be used in the construction of all <br /> driveways and parking areas. Driveway grade shall be not more than 10%. <br /> J. Setbacks <br /> Setbacks are to be as required by the City of Hugo pursuant to the approved Planned Unit <br /> Development guidelines for Adelaide Landing. <br /> K. Landscaping <br /> A landscape plan is required as a part of the ARC Review process. All Landscaping shall be <br /> completed by the Builder or Owner within 180 days after closing on the home. <br /> Landscaping Plans must include a plant list. Front yard landscaping must include foundation <br /> plantings as well as one over story deciduous tree (minimum of 2.5" trunk caliper) or one <br /> coniferous tree(minimum of 6'in height). This is in addition to the developer-installed boulevard <br /> tree(s) as shown on the approved Landscape Plan for Adelaide Landing. <br /> All yard areas except natural areas, planting beds, decks, garden, play areas and pavements, must <br /> be sodded. No seeding is permitted. All vegetable gardens and play areas must be located in the <br /> rear yard. <br /> i.) Sod: Sod shall be installed throughout the entire yard and front boulevard of the home <br /> site upon completion of construction. The Lot shall be fully sodded by Builder on or <br /> before the earlier of 150 days after issuance of the building permit for the Lot or fifteen <br /> days after installation of the driveway on the Lot. In the event the home on the Lot is <br /> completed between October 15 and June 1 of any year,then the Lot shall be fully sodded <br /> on or before July 31 following completion of the home. <br /> ii.) Irrigation Systems: Lot irrigation systems are required for all homes. Adelaide Landing <br /> includes a water reuse system; irrigation water is pumped from the neighborhood ponds. <br /> The Master Homeowners Association is responsible for the mainline system which is <br /> stubbed to each property. Property owners are responsible for the installation and <br /> maintenance of irrigation lines and controllers within the owner's lot. <br /> iii.)Retaining Walls: Check city requirements for permit, design, certification, and <br /> construction requirements. Do not locate any portion of a retaining wall below the 100- <br /> year high water elevation of any wetland or stormwater pond. No retaining walls shall be <br /> placed within a city or HOA based drainage and utility easement. <br /> iv.) Landscaping: (excluding sodding, which is addressed above) shall be completed by the <br /> Builder or Owner within 180 days after closing on the home. <br /> L. Fences <br /> Fences are not permitted for the Villa Homes. Fences for the Single Family Homes are permitted <br /> with the prior approval of the ARC. Materials must be durable and match the aesthetic themes of <br /> the home and community. The material of the fencing will be approved at the sole discretion of <br /> NOTE Declarant reserves the right to make amendments at anytime to these Architectural and Landscape Guidelines. <br /> 4 <br />