My WebLink
|
Help
|
About
|
Sign Out
Home
PC Packet 03.23.17
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2017 PC Packets
>
PC Packet 03.23.17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2020 11:13:08 AM
Creation date
12/10/2018 8:30:07 AM
Metadata
Fields
Template:
Commissions
Meeting Date
3/23/2017
Document Type
Agenda/Packets
Commission Name
Planning
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 9 <br />Streets/Access <br />The applicant is proposing three access locations onto 130th Street to the south and connections <br />to 135th Street to the east, Flay Avenue to the north, and 137th Street to the west. The applicant <br />has also provided access to the property to the east just north of 130th Street. A detailed traffic <br />analysis was completed as part of the EAW. The results of the EAW indicate the development <br />can be accommodated, provided a number of improvements to 130th Street are completed. The <br />existing signal timing at TH 61 and 130th Street will also require monitoring, with potential <br />changes made by MnDOT. <br />The property is located within the northeast quadrant of the Highway 61 and 130th Street <br />intersection. The intersection is signalized and the signal/intersection was designed assuming the <br />development of this property. Staff does not expect improvements to the intersection itself as a <br />result of the proposed development. <br />A long-range plan was developed in 2008 for Highway 61 that includes the following for <br />Highway 61: <br />• Four -lane divided roadway <br />• An additional 40 feet of right-of-way required within the development property. <br />• Full access at 137th Street <br />• Right-in/right-out access at 134th Street <br />As the proposed development moves forward, nearly all of the roadway segment between <br />Highway 61 and Goodview Avenue will be developed on the north and south sides. 130th Street <br />is currently a two-lane, rural section roadway. Staff recommended, and the City Council and <br />Commissions agreed, during the sketch plan that the upgrade of 130th Street to an urban -section <br />road between Highway 61 and Goodview Avenue should be completed with the development as <br />outlined in the City's long-range plans. <br />Staff has been working with the applicant on a number of items regarding the <br />improvement/reconstruction of 130th Street. The design of the road is being discussed and the <br />addition of a roundabout at Flay Avenue and 130th Street as the street connects to the <br />development is being considered. The design will include 130th Street being upgraded to an <br />urban -section road, with curb and gutter, and will have an 8 foot bituminous trial on the north <br />side. Staff is discussing with the applicant the appropriate cost share and timing of the <br />improvements. The developer cost responsibilities will be identified and included in the <br />development agreement for the first phase of the project. <br />The applicant is showing a road connecting the north and south areas of the development. The <br />applicant has done a good job addressing the concerns that the Council and Commission had <br />regarding the previous plan showing a long road connecting the north and south portions of the <br />development. Staff is comfortable with the new road design as proposed in the plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.