Laserfiche WebLink
Page 9 <br /> Streets/Access <br /> The applicant is proposing three access locations onto 130th Street to the south and connections <br /> to 135th Street to the east, Flay Avenue to the north, and 137th Street to the west. The applicant <br /> has also provided access to the property to the east just north of 130th Street. A detailed traffic <br /> analysis was completed as part of the EAW. The results of the EAW indicate the development <br /> can be accommodated,provided a number of improvements to 130th Street are completed. The <br /> existing signal timing at TH 61 and 130th Street will also require monitoring, with potential <br /> changes made by MnDOT. <br /> The property is located within the northeast quadrant of the Highway 61 and 130th Street <br /> intersection. The intersection is signalized and the signal/intersection was designed assuming the <br /> development of this property. Staff does not expect improvements to the intersection itself as a <br /> result of the proposed development. <br /> A long-range plan was developed in 2008 for Highway 61 that includes the following for <br /> Highway 61: <br /> • Four-lane divided roadway <br /> • An additional 40 feet of right-of-way required within the development property. <br /> • Full access at 137th Street <br /> • Right-in/right-out access at 134th Street <br /> As the proposed development moves forward, nearly all of the roadway segment between <br /> Highway 61 and Goodview Avenue will be developed on the north and south sides. 130th Street <br /> is currently a two-lane, rural section roadway. Staff recommended, and the City Council and <br /> Commissions agreed, during the sketch plan that the upgrade of 130th Street to an urban-section <br /> road between Highway 61 and Goodview Avenue should be completed with the development as <br /> outlined in the City's long-range plans. <br /> Staff has been working with the applicant on a number of items regarding the <br /> improvement/reconstruction of 130th Street. The design of the road is being discussed and the <br /> addition of a roundabout at Flay Avenue and 130th Street as the street connects to the <br /> development is being considered. The design will include 130th Street being upgraded to an <br /> urban-section road, with curb and gutter, and will have an 8 foot bituminous trial on the north <br /> side. Staff is discussing with the applicant the appropriate cost share and timing of the <br /> improvements. The developer cost responsibilities will be identified and included in the <br /> development agreement for the first phase of the project. <br /> The applicant is showing a road connecting the north and south areas of the development. The <br /> applicant has done a good job addressing the concerns that the Council and Commission had <br /> regarding the previous plan showing a long road connecting the north and south portions of the <br /> development. Staff is comfortable with the new road design as proposed in the plan. <br />