Laserfiche WebLink
Page 13 <br />Drainage and Utility Easements <br />There are a number of Outlots included as part of the plat. Outlots that contain stormwater ponds <br />and/or park are proposed to be deeded to the City; the remainder of the Outlots should include <br />drainage and utility easements. <br />Utilities <br />Water service is available to the site via existing watermains adjacent to the development <br />property. The water system will be looped through the development and will be extended to the <br />plat boundaries for future development. A portion of the water system may qualify for oversize <br />cost -sharing per City policy, which will be addressed as part of the Development Agreement as <br />the project moves forward. <br />The sanitary sewer will be connected to the existing system to provide sewer service to the <br />development, which is generally consistent with the City's Comprehensive Plan. The southwest <br />portion of the development is proposed to be served by the sanitary sewer located in the southern <br />half of Highway 61 and 1301h Street. The northern portion of the development will be served by <br />the existing sanitary sewer system located within the adjacent neighborhoods. The lots in the <br />central, southern and eastern portion of the development will be served by the existing system <br />located along 1301h Street that consists of gravity sewer, lift station, and forcemain. <br />Water and sewer trunk fees will apply to this project, and will be reviewed as the project moves <br />forward. <br />There are existing private utilities that extend through the site. Xcel Energy has an overhead <br />transmission line extending through the site (east/west) and Koch pipeline has an underground <br />pipeline extending through the site. The applicant will need to provide documentation of <br />approval from Xcel Energy and Koch to cross the easements and any restrictions that may apply. <br />5. CONCLUSION: <br />Staff believes that the layout of the proposed Adelaide Landing PUD general plan exceeds the <br />City's standards for residential developments. Excelsior Group has offered a more creative and <br />efficient approach to the existing constraints of the property through the site design layout. It is <br />in staff s opinion that the applicant meets all the requirements necessary to approve the PUD and <br />preliminary plat. <br />6. RECOMMENDATION: <br />Staff recommends the Planning Commission provide any recommendations to the City Council <br />regarding potential environmental impacts that may warrant further investigation before the <br />project is started and if there is a need for an Environmental Impact Statement (EIS). <br />