My WebLink
|
Help
|
About
|
Sign Out
Home
PC Packet 03.23.17
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2017 PC Packets
>
PC Packet 03.23.17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2025 3:03:18 PM
Creation date
12/10/2018 8:30:07 AM
Metadata
Fields
Template:
Commissions
Meeting Date
3/23/2017
Document Type
Agenda/Packets
Commission Name
Planning
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION 2017- <br /> APPROVING PUD GENERAL PLAN FOR EXCELSIOR GROUP, LLC, FOR <br /> "ADELAIDE LANDING" ON PROPERTY LOCATED EAST OF HIGHWAY 61 <br /> AND NORTH OF 130TH STREET <br /> WHEREAS, The Excelsior Group, LLC, has requested approval of a PUD general plan to <br /> allow approximately 319 single family residential lots and 10 outlots on the 216 acre <br /> property legally described as follows: <br /> (See Attached) <br /> WHEREAS, the Planning Commission has reviewed the PUD general plan at a duly <br /> called Public Hearing and recommends approval, and; <br /> NOW, THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF <br /> THE CITY OF HUGO, MINNESOTA, that it should and hereby does approve the <br /> request by The Excelsior Group. LLC, subject to the following conditions: <br /> 1. A PUD general plan is approved to allow the creation of approximately 319 single <br /> family residential lots and 10 outlots. The development shall be constructed in <br /> accordance with the application and plans received by the City on February 6, 2017, <br /> March 10, 2017, March 11, 2017, March 13, 2017, and March 16, 2017, except as <br /> amended by this resolution. <br /> 2. Approval is contingent upon City Council approval of the requested rezoning of the <br /> 216 acre property and preliminary plat. <br /> 3. The PUD general plan is approved based on the finding that the proposed project is <br /> consistent with the City's Comprehensive Plan. <br /> 4. The developer shall comply with all conditions in the City Engineer's letter dated <br /> March 17, 2017. <br /> 5. PUD flexibility is granted to allow: <br /> a. Flexibility to allow various lot sizes with a minimum lot size of 5,850 square feet, <br /> where 10,400 square feet is required. <br /> b. Flexibility to allow various lot width with a minimum lot width of 45 feet, were <br /> 80 feet is required by ordinance. <br /> c. Flexibility to allow a minimum front setback of 20 feet, where 30 feet is required. <br /> d. Flexibility to allow a minimum rear setback of 25 feet, where 30 feet is required. <br /> e. Flexibility to allow a minimum side yard setback of 7.5 feet, where 10 feet is <br /> required. <br /> f. Flexibility to allow a maximum impervious coverage of a lot to be 55%, where <br /> 50% is required. <br />
The URL can be used to link to this page
Your browser does not support the video tag.