Laserfiche WebLink
Resolution 2017- <br />Page 4 <br />Signage <br />c. Final design and location of the entrance monument signage for the development <br />shall be reviewed and approved by staff. <br />d. The developer shall enter into an easement agreement for access and maintenance <br />of the landscaping and signage with in Outlots A, C, D, H, I, and J. <br />Streets/Access <br />e. The plans shall be revised to show 130'1i as an urban section road to street <br />standards, including the 8 foot bituminous trail on the north side. The final plans <br />must be submitted for review and approval by staff. <br />Architecture <br />f. The developer shall develop and implement architectural review and design <br />guidelines for all residential buildings. These guidelines shall be consistent with <br />the draft architectural and landscaping guidelines provided by the developer for <br />the PUD General Plan dated March 13, 2017. <br />Miscellaneous <br />g. Architectural design guidelines shall be reviewed approved by City staff. <br />ADOPTED by the City Council this 17t1i day of April, 2017. <br />Tom Weidt, Mayor <br />ATTEST: <br />Michele Lindau, City Clerk <br />