My WebLink
|
Help
|
About
|
Sign Out
Home
PC Packet 03.23.17
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2017 PC Packets
>
PC Packet 03.23.17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2025 3:03:18 PM
Creation date
12/10/2018 8:30:07 AM
Metadata
Fields
Template:
Commissions
Meeting Date
3/23/2017
Document Type
Agenda/Packets
Commission Name
Planning
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Resolution 2017- <br /> Page 3 <br /> prior to installation. This shall be constructed by and paid <br /> for by the developer. <br /> c. Prior to the issuance of a building permit for any lot north of Lot 1, Block 15, the <br /> entire length of Street 1 to Street 2 shall be constructed with the first layer of <br /> bituminous. No lots shall be issued a building permit until they are provided <br /> access to 1301h Street via Street 1 and 2. <br /> 7. The building setbacks and impervious surface coverage requirements for the PUD are <br /> as follows: <br /> 45'and 55' Wide 50',65' and 85' <br /> Villa Lots 70'Wide Wide <br /> Lots Lots <br /> Front Setback 20 Ft—Side Load Garage 25 Ft 25 Ft <br /> min 25 Ft—Front Load Garage <br /> Side Setback 7.5 Ft 7.5 Ft 10 Ft <br /> (min) <br /> Rear Setback 25 Ft 30 Ft 30 Ft <br /> min <br /> Lot Impervious 55% 50% 50% <br /> (max) <br /> 8. A stormwater re-use system, as shown in the plans, shall be constructed with the <br /> development. The final plans shall be reviewed and approved by staff. The system <br /> will be installed by the applicant, and owned/operated/maintained by the <br /> homeowner's association. A stormwater reuse agreement shall be reviewed an <br /> approved by staff and recoded at Washington County. <br /> 9. The developer has indicated that an HOA will be established for the development to <br /> own/operate/maintain community areas, landscaping, and the water re-use system. <br /> The HOA documents shall be reviewed and approved by staff prior to the recording <br /> of the final plat for the Phase 1. <br /> 10. The applicant must comply with the following, prior to Final Plat and Final PUD Plan <br /> application: <br /> Landscaping and Lighting <br /> a. The landscape plan shall be revised to include the number, size, and type of trees <br /> and shrubs in each proposed location. <br /> b. The final landscape plans must be submitted for review and approval by staff. <br />
The URL can be used to link to this page
Your browser does not support the video tag.