My WebLink
|
Help
|
About
|
Sign Out
Home
PC Packet 03.23.17
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2017 PC Packets
>
PC Packet 03.23.17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2020 11:13:08 AM
Creation date
12/10/2018 8:30:07 AM
Metadata
Fields
Template:
Commissions
Meeting Date
3/23/2017
Document Type
Agenda/Packets
Commission Name
Planning
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Resolution 2017- <br />Page 3 <br />prior to installation. This shall be constructed by and paid <br />for by the developer. <br />c. Prior to the issuance of a building permit for any lot north of Lot 1, Block 15, the <br />entire length of Street 1 to Street 2 shall be constructed with the first layer of <br />bituminous. No lots shall be issued a building permit until they are provided <br />access to 1301h Street via Street 1 and 2. <br />7. The building setbacks and impervious surface coverage requirements for the PUD are <br />as follows: <br />45' and 55' Wide <br />50', 65' and <br />85' <br />Villa Lots <br />70'Wide <br />Wide <br />Lots <br />Lots <br />Front Setback <br />20 Ft — Side Load Garage <br />25 Ft <br />25 Ft <br />min <br />25 Ft — Front Load Garage <br />Side Setback <br />7.5 Ft <br />7.5 Ft <br />10 Ft <br />(min) <br />Rear Setback <br />25 Ft <br />30 Ft <br />30 Ft <br />min <br />Lot Impervious <br />55% <br />50% <br />50% <br />(max) <br />8. A stormwater re -use system, as shown in the plans, shall be constructed with the <br />development. The final plans shall be reviewed and approved by staff. The system <br />will be installed by the applicant, and owned/operated/maintained by the <br />homeowner's association. A stormwater reuse agreement shall be reviewed an <br />approved by staff and recoded at Washington County. <br />9. The developer has indicated that an HOA will be established for the development to <br />own/operate/maintain community areas, landscaping, and the water re -use system. <br />The HOA documents shall be reviewed and approved by staff prior to the recording <br />of the final plat for the Phase 1. <br />10. The applicant must comply with the following, prior to Final Plat and Final PUD Plan <br />application: <br />Landscaping and Lighting <br />a. The landscape plan shall be revised to include the number, size, and type of trees <br />and shrubs in each proposed location. <br />b. The final landscape plans must be submitted for review and approval by staff. <br />
The URL can be used to link to this page
Your browser does not support the video tag.