My WebLink
|
Help
|
About
|
Sign Out
Home
PC Packet 03.23.17
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2017 PC Packets
>
PC Packet 03.23.17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2020 11:13:08 AM
Creation date
12/10/2018 8:30:07 AM
Metadata
Fields
Template:
Commissions
Meeting Date
3/23/2017
Document Type
Agenda/Packets
Commission Name
Planning
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Resolution 2015-39 <br />Page 2 <br />4. The developer shall provide escrow money or other <br />payment method approved by the City for the <br />improvements to 130th Street per the cost sharing <br />agreement. <br />ii. The developer shall work with the City on the final layout of the <br />Villa homes on the western portion of the plat. <br />iii. Park improvements: <br />1. Grading and seeding within the City owned outlot (Oulot <br />A, County Ponds) and the area south of the powerline <br />easement. This shall be completed by and paid for by the <br />developer. <br />b. Phase 2 shall include: <br />i. The entire length of 130th Street, from T.H. 61 to Goodview <br />Avenue, shall be constructed as an urban section roadway to City <br />standard, with a trail, with the first layer of bituminous prior to <br />issuance of a Certificate of Occupancy for the 1 st building. <br />1. This improvement shall include increase in the forcemain <br />size that connects the development to the 130th Street lift <br />station. <br />ii. Park improvements: <br />1. Grading and seeding on Outlot C, within the area north of <br />the powerline easement. This shall be completed by and <br />paid for by the developer <br />2. An 8' bituminous trail, boardwalk, and landscaping shall be <br />installed within all of Outlot C. Final location of the trail <br />and boardwalk shall be reviewed and approved by staff <br />prior to installation. This shall be constructed by and paid <br />for by the developer. <br />c. Prior to the issuance of a building permit for any lot north of Lot 1, Block <br />15, the entire length of Street 1 to Street 2 shall be constructed with the <br />first layer of bituminous. No lots shall be issued a building permit until <br />they are provided access to 130th Street via Street 1 and 2. <br />6. The building setbacks and impervious surface requirements for the development are <br />as follows: <br />45' and 55' Wide <br />50', 65' and <br />85' <br />Villa Lots <br />70'Wide <br />Wide <br />Lots <br />Lots <br />Front Setback <br />20 Ft — Side Load Garage <br />25 Ft <br />25 Ft <br />min <br />25 Ft — Front Load Garage <br />Side Setback <br />7.5 Ft <br />7.5 Ft <br />10 Ft <br />(min) <br />Rear Setback <br />25 Ft <br />30 Ft <br />30 Ft <br />min <br />
The URL can be used to link to this page
Your browser does not support the video tag.