My WebLink
|
Help
|
About
|
Sign Out
Home
PC Packet 03.23.17
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2017 PC Packets
>
PC Packet 03.23.17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2025 3:03:18 PM
Creation date
12/10/2018 8:30:07 AM
Metadata
Fields
Template:
Commissions
Meeting Date
3/23/2017
Document Type
Agenda/Packets
Commission Name
Planning
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Resolution 2015-39 <br /> Page 2 <br /> 4. The developer shall provide escrow money or other <br /> payment method approved by the City for the <br /> improvements to 130th Street per the cost sharing <br /> agreement. <br /> ii. The developer shall work with the City on the final layout of the <br /> Villa homes on the western portion of the plat. <br /> iii. Park improvements: <br /> 1. Grading and seeding within the City owned outlot (Oulot <br /> A, County Ponds) and the area south of the powerline <br /> easement. This shall be completed by and paid for by the <br /> developer. <br /> b. Phase 2 shall include: <br /> i. The entire length of 130th Street, from T.H. 61 to Goodview <br /> Avenue, shall be constructed as an urban section roadway to City <br /> standard, with a trail, with the first layer of bituminous prior to <br /> issuance of a Certificate of Occupancy for the 1 st building. <br /> 1. This improvement shall include increase in the forcemain <br /> size that connects the development to the 130th Street lift <br /> station. <br /> ii. Park improvements: <br /> 1. Grading and seeding on Outlot C, within the area north of <br /> the powerline easement. This shall be completed by and <br /> paid for by the developer <br /> 2. An 8' bituminous trail, boardwalk, and landscaping shall be <br /> installed within all of Outlot C. Final location of the trail <br /> and boardwalk shall be reviewed and approved by staff <br /> prior to installation. This shall be constructed by and paid <br /> for by the developer. <br /> c. Prior to the issuance of a building permit for any lot north of Lot 1, Block <br /> 15, the entire length of Street 1 to Street 2 shall be constructed with the <br /> first layer of bituminous. No lots shall be issued a building permit until <br /> they are provided access to 130th Street via Street 1 and 2. <br /> 6. The building setbacks and impervious surface requirements for the development are <br /> as follows: <br /> 45'and 55' Wide 50',65' and 85' <br /> Villa Lots 70'Wide Wide <br /> Lots Lots <br /> Front Setback 20 Ft—Side Load Garage 25 Ft 25 Ft <br /> min 25 Ft—Front Load Garage <br /> Side Setback 7.5 Ft 7.5 Ft 10 Ft <br /> (min) <br /> Rear Setback 25 Ft 30 Ft 30 Ft <br /> min <br />
The URL can be used to link to this page
Your browser does not support the video tag.