My WebLink
|
Help
|
About
|
Sign Out
Home
PC Packet 05.19.17
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2017 PC Packets
>
PC Packet 05.19.17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2018 11:39:42 AM
Creation date
12/10/2018 8:31:11 AM
Metadata
Fields
Template:
Commissions
Meeting Date
5/19/2017
Document Type
Agenda/Packets
Commission Name
Planning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gopher State Ministorage Site Plan <br />Page 2 <br />B. Existing Site Characteristics <br />The 3.27 acre property does contain some challenges in regards to an existing drainage ditch, <br />floodplain, high ground water, wetlands, right-of-way dedication, and a sanitary sewer pipe <br />going through the property. The site has been farmed for several years and is relatively flat with <br />trees along the east property line. <br />3. BACKGROUND: <br />The site is generally located north of 152nd Street and east of TH 61. The applicant is proposing <br />to construct seven (7) buildings for a total of 21,700 square feet for a ministorage facility. The <br />proposed buildings are requested to be a variety of sizes with varying unit sizes. The site is <br />proposed to be run completely electronically with no property management on site. <br />4. ANALYSIS: <br />A. Level of City Discretion in Decision -Making <br />The City's discretion in approving or denying a site plan is limited to whether or not the <br />proposed project complies with the Comprehensive Plan and Zoning Ordinance requirements. If <br />it meets these standards, the City must then approve the site plan. <br />B. Consistency with Ordinance Standards <br />Site Plan <br />Phasing Plan <br />The proposed development is planned to be constructed in two phases. Phase one would include <br />the grading and construction of the storm sewer for the entire site as well as construction of the <br />stormwater basin. The applicant has indicated they will then place curb and gutter, bituminous <br />paving, and restoration associated with phase one. The applicant plans to construct four (4) <br />buildings in phase one, as well as install all landscaping and fencing associated with phase one. <br />Phase two would include the placing of curb and gutter, bituminous paving, and restoration <br />associated with phase two. The applicant plans to construct the final three (3) buildings in phase <br />two, as well as install all landscaping and fencing associated with phase two. <br />The proposed phasing plan and requirements have been added as a condition of approval. <br />Setbacks <br />The proposed development has complies with the 30 -foot front and rear yard setback. The <br />ordinance requires a side yard setback equal to the height of the building, in no case less than 10 <br />feet. The proposed development complies with the setback requirements. <br />
The URL can be used to link to this page
Your browser does not support the video tag.