Laserfiche WebLink
District I <br />Additional trunk system improvements following the development of <br />Sub -District 11 include the extension of a 10 -inch trunk main to the <br />service area. No additional trunk sanitary sewer main improvements <br />will be required following the possible development of Sub -districts 15 <br />and 16 that are currently not serviced by the sanitary sewer system. <br />However, system improvements will be required and include the <br />extension of 8 -inch sanitary sewers within each sub -district to serve <br />each by gravity main. A portion of Sub -district 11 wastewater flows <br />will be directed to Sub -district 12 and eventually outlet to the MCES <br />interceptor at connection point 11. Sub -district 15 wastewater flows <br />will be directed to Sub -district 14. The extension of sanitary sewer to <br />Sub -districts 15 and 16 would result in the total peak flows entering <br />Lift Station No. 2 exceeding the capacity of the lift station. Thus, the <br />capacity of Lift Station No. 2 pumps would need to be upgraded from <br />400 gpm to at least 420 gpm before total sewer service expansion into <br />Sub -districts 15 and 16. Sub -district 16 sanitary sewer improvements <br />will consist of the extension of an 8 -inch sanitary sewer and the <br />construction of Lift Station 16 with a minimum pumping capacity of <br />115 gpm. Wastewater flows from this lift station will then be directed <br />to Sub -district 14 prior to entering the MCES interceptor at connection <br />point 11. <br />District J <br />To serve the future commercial and low density residential in Sub- <br />district J5, the extension 8 -inch sanitary sewers will be required, which <br />can connect to the existing 10 -inch trunk sewers in Sub -districts J2 <br />and J4. <br />District K <br />An 8 -inch sanitary sewer will be expanded to serve the future <br />medium density residential Sub -district K3. This district's flows will <br />be connected to and flow into existing extension sewer lines in Sub- <br />district K2. To serve the future low density residential Sub -district K6, <br />the extension of 8 -inch sanitary sewer will be required from Sub -district <br />K4. <br />District L <br />No additional trunk sanitary sewer main improvements will be required <br />following the possible development of Sub -districts L2 and L3 that is <br />currently not serviced by the trunk sanitary sewer system. However, <br />system improvements will be required and include the extension of <br />8 -inch sanitary sewers to the east from Sub -district L1 to serve Sub- <br />district L2 by gravity main. Sub -district L3 improvements will include <br />the extension of an 8 -inch sanitary sewer from the MCES Interceptor <br />Sewer. <br />District N. <br />No additional trunk sanitary sewer main improvements will be required <br />following the possible development of Sub -districts M2 and M3, <br />currently not serviced by the trunk sanitary sewer system. However, <br />system improvements will be required and include the extension of <br />8 -inch sanitary sewers to the south and east from Sub -district M1 to <br />serve the districts by gravity main. <br />District N <br />Trunk sanitary sewer main improvements will be required following <br />the possible development of Sub -district N1 and additional sanitary <br />sewer improvements will be required following the development of <br />Sub -district N7, currently not serviced by the trunk sanitary sewer <br />system. Trunk system improvements for Sub -district N1 will include <br />the construction of Lift Station N1 with a minimum pumping capacity <br />of 220 gpm and the extension of a 10 -inch trunk sanitary sewer from <br />Sub -district N4. <br />System improvements will include the extension of 8 -inch sanitary <br />sewers to the north to serve the eastern portion Sub -district N3 by <br />gravity main which will be directed to the existing Lift Station No. 8 <br />located within Sub -district N2. Additional sanitary sewer improvements <br />for Sub -district N7 will include the installation of 8 -inch sanitary sewer <br />directed to Sub -district N6 prior to entering the MCES interceptor at <br />connection point N1. Service to Sub -district N8 will be accomplished <br />through the extension of 8 -inch sanitary sewer from Sub -districts N6 <br />and N9. <br />.0� <br />,r <br />I 2040 COMPREHENSIVE PLAN UPDATE DRAFT Dec 14-17 COMPREHENSIVE SANITARY A <br />SEWER PLAN <br />for review only <br />