Laserfiche WebLink
CITY OF HUGO <br />ATTACHMENT TO ORDINANCE NO. 2019-492 <br />2019 FEES, RATES AND CHARGES <br />TECHNOLOGY FEE 3% of total amount of all building related permits and plan reviews <br />- to be implemented when on-line permitting software goes live <br />BUILDING RELATED: <br />Air Conditioning (central) <br />Air -to -Air Heat Exchanger <br />Building Moving <br />City Inspection Fee (one hour minimum) <br />Building Permit Refund Charge <br />Driveway <br />Electrical <br />Fireplace (zero -clearance) <br />Gas Piping <br />Mechanical <br />Plumbing (per fixture) <br />Plan Review Fee - Identical Plans <br />Plan Review Fee - Non -Identical Plans <br />DEMOLITION RELATED: <br />Accessory Building <br />Commercial or Residential Building <br />DEVELOPMENT FEES: <br />Escrow for Engineering & Legal <br />Letter of Credit or Cash Escrow <br />City Engineering Technician Inspections <br />Parkland Dedication: <br />Commercial and Industrial <br />Residential <br />Sealcoating <br />Snowplowing <br />Stormwater Trunk Fee <br />LOCAL GOVERNMENT UNIT (LGU) FEES: <br />30.00 <br />ESCROW <br />30.00 <br />110.00 <br />FEES AND OTHER <br />58.00 <br />per hour <br />$500,001 - $1,000,000 <br />$ 3,427.75 for the first <br />$ <br />500,000.00 <br />set by contractor <br />$ 5.00 each additional <br />$ <br />1,000.00 <br />$1,000,001 and up <br />$ 5,945.25 for the first <br />$ <br />1,000,000.00 <br />8.00 <br />$ 4.00 each additional <br />$ <br />1,000.00 <br />BUILDING PERMIT SURCHARGES: <br />The following fees are found in Minnesota Statute 326B.148 <br />58.00 <br />TBD upon review <br />Fixed Fee Permit (includes building, plumbing, <br />mechanical, utility and electrical permits): fee is the greater of .0005 of fee or $1.00 <br />1,600.00 <br />Permits Based on Value: <br />Annual Wetland Mitigation Monitoring <br />(1) if valuation is $1,000,000 or less <br />.0005 of value <br />$ <br />200.00 <br />(2) if valuation is greater than $1,000,000 <br />$ 500 + .0004 of value between $1,000,000 and $2,000,000 <br />(3) if valuation is greater than $2,000,000 <br />$ 900 + .0003 of value between $2,000,000 and $3,000,000 <br />(4) if valuation is greater than $3,000,000 <br />$1,200 + .0002 of value between $3,000,000 and $4,000,000 <br />(5) if valuation is greater than $4,000,000 <br />$1,400 + .0001 of value between $4,000,000 and $5,000,000 <br />(6) if valuation is greater than $5,000,000 <br />$1,500 + .00005 of value that exceeds $5,000,000 <br />TECHNOLOGY FEE 3% of total amount of all building related permits and plan reviews <br />- to be implemented when on-line permitting software goes live <br />BUILDING RELATED: <br />Air Conditioning (central) <br />Air -to -Air Heat Exchanger <br />Building Moving <br />City Inspection Fee (one hour minimum) <br />Building Permit Refund Charge <br />Driveway <br />Electrical <br />Fireplace (zero -clearance) <br />Gas Piping <br />Mechanical <br />Plumbing (per fixture) <br />Plan Review Fee - Identical Plans <br />Plan Review Fee - Non -Identical Plans <br />DEMOLITION RELATED: <br />Accessory Building <br />Commercial or Residential Building <br />DEVELOPMENT FEES: <br />Escrow for Engineering & Legal <br />Letter of Credit or Cash Escrow <br />City Engineering Technician Inspections <br />Parkland Dedication: <br />Commercial and Industrial <br />Residential <br />Sealcoating <br />Snowplowing <br />Stormwater Trunk Fee <br />LOCAL GOVERNMENT UNIT (LGU) FEES: <br />30.00 <br />$ <br />30.00 <br />110.00 <br />$ 2,500.00 <br />58.00 <br />per hour <br />20% of permit <br />$ <br />55.00 <br />set by contractor <br />fees are available at bttps.1/wwwpi.-hu-qo.mn.us/buildinci permits_ <br />30.00 <br />30.00 <br />35.00 <br />plus 1 hour minimum inspection fee <br />8.00 <br />plus 1 hour minimum inspection fee <br />25% <br />of building permit fee <br />65% <br />of building permit fee <br />58.00 <br />TBD upon review <br />120.00 <br />$ 1,000.00 <br />4% <br />125% <br />93.00 per hour <br />Exempt <br />2,400.00 per unit <br />4.00 per lineal foot <br />0.500 per lineal foot <br />0.07 per square foot of net developable area <br />No -Loss Exemption Determination <br />$ <br />250.00 <br />Delineation Approval: <br />Less than 10 acres site <br />$ <br />275.00 <br />10 acre site or larger <br />$ <br />350.00 <br />Replacement Plan Application: <br />Less than 10 acres site <br />$ <br />550.00 <br />TBD upon review <br />10 acre site or larger <br />$ <br />800.00 <br />TBD upon review <br />Wetland Banking Application <br />$ <br />1,600.00 <br />TBD upon review <br />Annual Wetland Mitigation Monitoring <br />$ 2,500.00 <br />All Other Wetland Services <br />$ <br />200.00 <br />TBD upon review <br />LGU fees are in addition to planning & zoning fees land escrows) identified below. <br />PLANNING & ZONING RELATED: <br />CONDITIONAL/INTERIM USE RELATED: <br />Conditional/Interim Use Permit Application <br />Conditional/Interim Use Permit Amendments <br />Interim Use Permit Renewal <br />COMPREHENSIVE PLAN RELATED: <br />Comprehensive Plan Amendment <br />500.00 $ 1,000.00 <br />250.00 <br />250.00 <br />540.00 <br />Page 2 <br />of cost of improvements <br />of cost of improvements <br />5 -year escrow <br />Commercial Only <br />