My WebLink
|
Help
|
About
|
Sign Out
Home
2018.12.17 ORD 2018-492 Fee Schedule
Hugo
>
City Council
>
City Council Ordinances
>
2018 CC Ordinances
>
2018.12.17 ORD 2018-492 Fee Schedule
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2019 2:56:28 PM
Creation date
1/28/2019 2:56:28 PM
Metadata
Fields
Template:
City Council
Document Type
Ordinances
Meeting Date
12/17/2018
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF HUGO <br />ATTACHMENT TO ORDINANCE NO. 2019-492 <br />2019 FEES, RATES AND CHARGES <br />PUBLICATIONS: <br />Audit/Comprehensive Plan <br />$ <br />55.00 <br />per unit <br />ESCROW <br />$ <br />125.00 <br />FEES <br />Zoning Map <br />AND OTHER <br />PLANNING & ZONING RELATED (continued): <br />per unit <br />Zoning Ordinance <br />$ <br />65.00 <br />PLANNED UNIT DEVELOPMENT RELATED: <br />Other Publications <br />$ <br />Cost + 10% <br />per unit <br />Planned Unit Development Application <br />$ <br />$800 + $20 per lot <br />$ <br />5,000.00 <br />Planned Unit Development Amendment <br />$ <br />325.00 <br />$ <br />2,500.00 <br />PROPERTY LINE RELATED: <br />first half hour (minimum charge) <br />Grass/Weed Mowing <br />$ <br />50.00 <br />Encroachment Agreements <br />$ <br />120.00 <br />58.00 <br />per hour <br />Property Line Adjustment Application <br />$ <br />150.00 <br />per hour <br />All Other Equipment w/operator <br />REZONING RELATED: <br />150.00 <br />per hour <br />Sewer Infrastructure Connection Fee <br />$ <br />Rezoning Application (less than 5 acres) <br />$ <br />540.00 <br />$ <br />1,000.00 <br />Rezoning Application (more than 5 acres) <br />$ <br />1,080.00 <br />$ <br />1,000.00 <br />Rezoning to Long -Term Agricultural <br />$ <br />135.00 <br />per SAC unit as determined by preliminary justification report <br />Water Infrastructure Connection Fee <br />SITE PLAN RELATED: <br />680.00 <br />per SAC unit as determined by MCES <br />- Total WAC Fee <br />$ <br />Commercial or Industrial Site Plan <br />$ <br />350.00 <br />$ <br />5,000.00 <br />Farm Site Plan <br />$ <br />30.00 <br />Sketch Plan Review <br />$ <br />110.00 <br />STREET & ROADWAY RELATED: <br />Street and Easement Vacation <br />$ <br />110.00 <br />$ <br />1,000.00 <br />SUBDIVISION RELATED: Payable with Preliminary AND Final Plat Applications <br />Minor Subdivision - Rural (3 lots or less) <br />$ <br />220.00 <br />$ <br />1,000.00 <br />Minor Subdivision - Urban (3 lots or less) <br />$ <br />220.00 <br />$ <br />2,000.00 <br />Subdivision - 4 to 15 lots <br />$ <br />540.00 <br />$ <br />5,000.00 <br />Subdivision -16 to 30 lots <br />$ <br />700.00 <br />$ <br />10,000.00 <br />Subdivision - 31 to 100 lots <br />$25 per lot <br />$ <br />20,000.00 <br />Subdivision - Over 100 Lots <br />$25 per lot <br />$ <br />30,000.00 <br />VARIANCE RELATED: <br />Variance to Zoning Ordinance <br />$ <br />200.00 <br />Minor Deviations to Zoning Ordinance <br />$ <br />200.00 <br />PUBLICATIONS: <br />Audit/Comprehensive Plan <br />$ <br />55.00 <br />per unit <br />Municipal Code <br />$ <br />125.00 <br />per unit <br />Zoning Map <br />$ <br />7.00 <br />per unit <br />Zoning Ordinance <br />$ <br />65.00 <br />per unit <br />Other Publications <br />$ <br />Cost + 10% <br />per unit <br />DVD Recordings <br />$ <br />10.00 <br />Official Newspaper Exempt <br />PUBLIC WORKS RELATED: <br />$ <br />30.00 <br />Grass/Weed Mowing <br />$ <br />75.00 <br />first half hour (minimum charge) <br />Grass/Weed Mowing <br />$ <br />50.00 <br />each additional hour or fraction thereof <br />Maintenace Worker (no equipment) <br />$ <br />58.00 <br />per hour <br />Maintenace Worker w/pickup truck <br />$ <br />88.00 <br />per hour <br />All Other Equipment w/operator <br />$ <br />150.00 <br />per hour <br />ROADWAY RECONSTRUCTION/REHAB: <br />Single -Family Residential/Duplex Rates: <br />Complete Reconstruction <br />$ <br />5,200.00 <br />per unit <br />Partial Reconstruction <br />$ <br />4,100.00 <br />per unit <br />Roadway Reclamation/Overlay <br />$ <br />3,400.00 <br />per unit <br />Urban Roadway Overlay <br />$ <br />2,100.00 <br />per unit <br />Rural Roadway Overlay <br />$ <br />1,800.00 <br />per unit <br />UTILITY RELATED: <br />Water Utility Permit <br />$ <br />30.00 <br />Water Infrastructure Fee (in lieu of assessment) <br />$ <br />3,100.00 <br />per SAC unit as determined by MCES <br />Sewer Utility Permit <br />$ <br />30.00 <br />Sewer Infrastructure Fee (in lieu of assessment) <br />$ <br />3,100.00 <br />per SAC unit as determined by MCES <br />City Sewer Availability Charges (SAC): <br />Sewer Infrastructure Trunk Fee <br />$ <br />1,632.00 <br />rylustification report <br />Sewer Infrastructure Connection Fee <br />$ <br />588.00 <br />per SAC unit as determined by MCES <br />- Total SAC Fee <br />$ <br />2,220.00 <br />City Water Availability Charges (WAC): <br />Water Infrastructure Trunk Fee <br />$ <br />1,960.00 <br />per SAC unit as determined by preliminary justification report <br />Water Infrastructure Connection Fee <br />$ <br />680.00 <br />per SAC unit as determined by MCES <br />- Total WAC Fee <br />$ <br />2,640.00 <br />Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.