My WebLink
|
Help
|
About
|
Sign Out
Home
2019.02.04 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2019 CC Packets
>
2019.02.04 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2020 2:34:15 PM
Creation date
2/4/2019 6:30:16 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
2/4/2019
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
609
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
for categories of BMPs that you have established and the second table for categories of BMPs that you plan to <br />implement over the course of the permit term. <br />Include the measurable goals with appropriate timeframes that each BMP category will be implemented and <br />completed. In addition, provide interim milestones and the frequency of action in which the permittee will implement <br />and/or maintain the BMPs. Refer to the EPA's Measurable Goals Guidance for Phase 11 Small MS4s <br />(http://www.epa.gov/npdes/pubs/measurablegoals.pdf). If you have more than five categories, hit the tab key after <br />the last line to generate a new row. <br />Established BMP categories <br />Measurable goals and timeframes <br />ordinance <br />structural <br />Evaluate effectiveness for each project as projects occur <br />Nonstructural <br />Evaluate effectiveness for each project as projects occur <br />infiltration <br />Evaluate effectiveness for each project as projects occur <br />BMP cateaories to be implemented <br />Measurable goals and timeframes <br />Reduce the amount of storm runoff leaving the site as projects <br />Water reuse and site conditions warrant this use <br />5. Provide the name or the position title of the individual(s) who is responsible for implementing and/or coordinating this <br />MCM: <br />Senior Engin eering Technician <br />F. MCM 6: Pollution prevention/good housekeeping for municipal operations <br />1. The Permit (Part III.D.6.) requires that, within 12 months of the date permit coverage is extended, existing permittees shall <br />revise their current program, as necessary, and continue to implement an operations and maintenance program that <br />prevents or reduces the discharge of pollutants from the permittee owned/operated facilities and operations to the small <br />MS4. Describe your current program: <br />spring and fall street sweeping, reduce salt application and apply salt brine to specific roadways when 2" or less snow fall <br />anticipated <br />2. Do you have a facilities inventory as outlined in the Permit (Part III.D.6.a.)? <br />❑ Yes ® No <br />3. If you answered no to the above permit requirement in question 2, describe the tasks and corresponding schedules that <br />will be taken to assure that, within 12 months of the date permit coverage is extended, this permit requirement is met: <br />Within 12 months of permit coverage renewal establish a facilities inventory <br />4. List the categories of BMPs that address your pollution prevention/good housekeeping for municipal operations program. <br />Use the first table for categories of BMPs that you have established and the second table for categories of BMPs that you <br />plan to implement over the course of the permit term. <br />Include the measurable goals with appropriate timeframes that each BMP category will be implemented and completed. In <br />addition, provide interim milestones and the frequency of action in which the permittee will implement and/or maintain the <br />BMPs. For an explanation of measurable goals, refer to the EPA's Measurable Goals Guidance for Phase 11 Small MS4s <br />(hftp://www.ei)a.gov/ni)des/pubs/measurablegoals.i)df). <br />If you have more than five categories, hit the tab key after the last line to generate a new row. <br />Established BMP cateaories <br />Street <br />reduction in snow and ice control chemicals <br />Measurable goals and timeframes <br />Sweep roadways in the MS4 storm sewer area a minimum of <br />twice yearly track the volume of material removed from <br />Calibrate ice and snow control applicators at the beginning of <br />the winter season reduced amount of chemicals ordered and <br />applied <br />www.pca.state.mn.us 651-296-6300 800-657-3864 TTY 651-282-5332 or 800-657-3864 • Available in alternative formats <br />wq-strm4-49a • 5131113 Page 12 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.