Laserfiche WebLink
g. Does your program retain construction site inspection checklists or other written materials used to ® Yes ❑ No <br />document site inspections? <br />If you answered no to any of the above permit requirements, describe the tasks and corresponding schedules that will be <br />taken to assure that, within 12 months of the date permit coverage is extended, these permit requirements are met. <br />3. List the categories of BMPs that address your construction site stormwater runoff control program. Use the first <br />table for categories of BMPs that you have established and the second table for categories of BMPs that you plan <br />to implement over the course of the permit term. <br />Include the measurable goals with appropriate timeframes that each BMP category will be implemented and <br />completed. In addition, provide interim milestones and the frequency of action in which the permittee will implement <br />and/or maintain the BMPs. Refer to the EPA's Measurable Goals Guidance for Phase 11 Small MS4s <br />(http://www.epa.gov/npdes/pubs/measurablegoals.pdf). If you have more than five categories, hit the tab key <br />after the last line to generate a new row. <br />Established BMP categories <br />Measurable goals and timeframes <br />Silt fence <br />Before construction starts <br />Inlet protection <br />As inlets are installed existing structures prior to construction <br />Bio logs <br />As needed <br />Temporary seed and mulch erosion control <br />blanket <br />As grading is completed <br />Rock construction entrance <br />As construction starts and progresses <br />Temporary / permanent storm water pond <br />As site specifies or allows <br />BMP categories to be implemented Measurable goals and timeframes <br />infiltration As sites warrant <br />structural As sites warrant <br />4. Provide the name or the position title of the individual(s) who is responsible for implementing and/or coordinating this <br />MCM: <br />building officals/ inspectors, Senior Engineering Technician, Director of Public Works <br />E. MCM 5: Post -construction stormwater management <br />1. The Permit (Part III.D.5.) requires that, within 12 months of the date permit coverage is extended, existing permittees <br />shall revise their current program, as necessary, and continue to implement and enforce a post -construction stormwater <br />management program. Describe your current program: <br />The City uses RCWD standards for post construction stormwater <br />2. Have you established written procedures for site plan reviews that you will conduct prior to the start of <br />® Yes ❑ No <br />construction activity? <br />3. Answer yes or no to indicate whether you have the following listed procedures for documentation of <br />post -construction stormwater management according to the specifications of Permit (Part III.D.5.c.): <br />a. Any supporting documentation that you use to determine compliance with the Permit (Part <br />® Yes ❑ No <br />III.D.5.a), including the project name, location, owner and operator of the construction activity, any <br />checklists used for conducting site plan reviews, and any calculations used to determine <br />compliance? <br />b. All supporting documentation associated with mitigation projects that you authorize? <br />® Yes ❑ No <br />c. Payments received and used in accordance with Permit (Part III.D.5.a.(4)(f))? <br />® Yes ❑ No <br />d. All legal mechanisms drafted in accordance with the Permit (Part III.D.5.a.(5)), including date(s) of <br />® Yes ❑ No <br />the agreement(s) and names of all responsible parties involved? <br />If you answered no to any of the above permit requirements, describe the steps that will be taken to assure that, within <br />12 months of the date permit coverage is extended, these permit requirements are met. <br />4. List the categories of BMPs that address your post -construction stormwater management program. Use the first table <br />www.pca.state.mn.us 651-296-6300 800-657-3864 TTY 651-282-5332 or 800-657-3864 • Available in alternative formats <br />wq-strm4-49a • 5131113 Page 11 of 14 <br />