My WebLink
|
Help
|
About
|
Sign Out
Home
2019.02.04 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2019 CC Packets
>
2019.02.04 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2020 2:34:15 PM
Creation date
2/4/2019 6:30:16 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
2/4/2019
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
609
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
In order to achieve these goals, it is anticipated the City will need to implement the <br />following actions: <br />a) Retrofit existing BMPs to enhance removal in areas tributary to Bald <br />Eagle Lake <br />Existing BMPs that are in place for areas tributary to Bald Eagle Lake <br />could be retrofitted to enhance their removal capabilities either through <br />increasing storm water storage enhanced infiltration, or providing <br />flocculation treatment. The Bald Eagle Lake TMDL has assigned an <br />allowable target load for phosphorus leaving the City of 468 pounds <br />annually. This would require the City of Hugo to reduce future <br />phosphorus loadings to the lake by 287 pounds. <br />b) Implement infiltration and other BMPs to allow for no increase in <br />pollutant load from developing areas <br />c) Implement new BMPs in development and redevelopment to reduce load <br />to targeted levels <br />CIP for Storm Water Projects Within the City of Hugo <br />City of Hugo, MN <br />WSB Project No. 1687-85 <br />Page 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.