Laserfiche WebLink
Ms. Michele Lindau <br />March 28, 2019 <br />Page 3 <br />Task 2 - Asbestos and Regulated Materials (ARM) Survey <br />An ARM Survey will be performed for the Site using destructive sampling methods to ensure all <br />regulated materials, or potentially regulated materials, are identified, sampled, and quantified. <br />The ARM Survey will include: <br />Asbestos Sam Ip inc <br />WSB will perform asbestos sampling at the Site structure to identify friable and non -friable <br />asbestos -containing materials (ACM) in accordance with EPA, MPCA, and MDH rules and <br />regulations. In addition, WSB will identify ACM that could become friable during <br />renovation/demolition activities, and according to State and Federal regulations, would require <br />abatement prior to disturbance. The survey will be performed by a US EPA -accredited and MDH- <br />certified AHERA Asbestos Inspector. It is anticipated that building materials disturbed during <br />sampling will not be replaced, including roofing materials. <br />Lead -Based Paint SamOina <br />WSB will collect lead -based paint (LBP) chip samples of predominate painted/coated surfaces at <br />the Site building. Additionally, painted/coated concrete surfaces that have the potential to be <br />recycled during the renovation/demolition process will be sampled. If LBP is detected, the <br />surfaces will be identified as requiring special management during recycling. The limited lead <br />sampling is not intended to satisfy Occupational Health and Safety Administration (OSHA) or <br />Housing and Urban Development (HUD) testing requirements. <br />Regulated Materials Inventory <br />WSB will complete an inventory of regulated materials that may require special handling and/or <br />disposal prior to renovation/demolition at the Site. WSB will also note other items present that <br />may require special attention prior to or during renovation/demolition including; wells, septic <br />systems, above/underground tanks, hoists, and oil water separators. <br />Final Documentation and Reportinu <br />WSB will summarize the results of the ARM Survey in a final report. At a minimum, the report will <br />include the following: <br />• Scope of work <br />• Sampling methods and procedures <br />• Figures identifying ACM and LBP sample locations <br />• Regulated materials inventory <br />• Investigation results including locations and quantities of all identified ACM and LBP <br />• Conclusions and recommendations <br />