My WebLink
|
Help
|
About
|
Sign Out
Home
2019.04.15 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2019 CC Packets
>
2019.04.15 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2020 2:06:27 PM
Creation date
4/12/2019 8:54:36 AM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
4/15/2019
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
246
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Michele Lindau <br />March 28, 2019 <br />Page 4 <br />Task 3 — Land Survey <br />A general land survey will be completed for the Site. The survey will include: <br />• Topographic Survey - Locating all visible features on the Site, including but limited to; <br />buildings, hard surfaces, utilities, trees and landscaping. <br />• Boundary Survey - Setting and marking all Site corners. <br />Assumptions <br />Task 1 — Phase I ESA Assumptions <br />The following items are assumed for Task 1 <br />• Property access will be facilitated by the City. <br />• Based on available MPCA information, no MPCA regulatory file reviews will be required. <br />• If additional MPCA file reviews are needed, they can be completed at an estimated cost <br />of $300 each. <br />• An Environmental Lien and AULs search will not be completed as part of this scope. <br />• If a reliance letter is desired, the cost is $300 per reliance letter and $100 for each <br />additional entity/party listed on the letter. <br />• The City will provide one final report review. <br />Task 2 — ARM Survey Assumr.)tions <br />The following conditions are assumed for Task 2: <br />• The City will provide Site access. <br />• Destructive sampling methods will be used and any damage caused during sampling will <br />not be repaired by WSB. <br />• It is anticipated that 50 asbestos bulk samples and 5 lead -based paint chip samples will <br />be collected and analyzed using a standard 5-day turnaround timeframe. <br />• Additional asbestos samples will be charged at a rate of $6.00 per sample and additional <br />paint samples will be charged at a rate of $10.00 per sample. <br />• The limited lead sampling is not intended to satisfy OSHA or HUD testing requirements. <br />• The City will provide one final report review. <br />Task 3 — Land Survey Assumr)tions <br />The following conditions are assumed for Task 4: <br />• This type of survey requires an ownership and encumbrance for the parcel (O&E). An <br />additional $250 fee will apply if the City does not have an O&E. <br />• This scope does not include certification of ALTA/NSPS Table A items 1, 2, 3, 4, 5, 6a, <br />7a, 8, and 11. <br />
The URL can be used to link to this page
Your browser does not support the video tag.