My WebLink
|
Help
|
About
|
Sign Out
Home
2019.04.15 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2019 CC Packets
>
2019.04.15 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2020 2:06:27 PM
Creation date
4/12/2019 8:54:36 AM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
4/15/2019
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
246
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Michele Lindau <br />March 28, 2019 <br />Page 5 <br />Total Cost and Schedule <br />The estimated cost to perform the described Environmental and Survey Services is not to exceed <br />$8,080. The table below presents the estimated cost breakdown for each task presented in this <br />scope. <br />1 — Phase I ESA <br />$2,031 <br />2 -Asbestos and Regulated Materials Survey <br />$2,589 <br />3 — Land Survey <br />$3,460 <br />Total Project Cost <br />$8,080 <br />If additional work is required beyond the summarized scope above, WSB will receive <br />authorization from the City prior to initiating the work. Upon authorization, WSB can initiate the <br />work immediately. If you wish to authorize this work, please sign below and submit a copy to <br />WSB. <br />Sincerely, <br />WSB <br />Ryan Spencer, CHMM <br />Senior Environmental Scientist <br />I hereby authorize the above scope of work, schedule, and cost. <br />Name (Print) <br />Signature <br />Date <br />Enclosures <br />WSB 2019 Rate Schedule <br />General Contract Provisions <br />
The URL can be used to link to this page
Your browser does not support the video tag.