My WebLink
|
Help
|
About
|
Sign Out
Home
2019.06.03 RESO 2019-28 Site Plan and CUP for Apple Academy
Hugo
>
City Council
>
City Council Resolutions
>
2019 CC Resolutions
>
2019.06.03 RESO 2019-28 Site Plan and CUP for Apple Academy
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 2:02:12 PM
Creation date
6/18/2019 2:02:12 PM
Metadata
Fields
Template:
City Council
Document Type
Resolutions
Meeting Date
6/3/2019
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION 2019 - 28 <br />APPROVING SITE PLAN AND CONDITIONAL USE PERMIT FOR CLASSIC <br />CONSTRUCTION, INC. FOR "APPLE ACADEMY" ON 13845 FOREST BOULEVARD <br />NORTH (PID 29-031-21-22-0008 AND 29-031-21-22-0006) <br />WHEREAS, Classic Construction, Inc. has requested approval of a site plan and conditional use <br />permit to allow construction of a daycare facility located at 13845 Forest Boulevard North on the <br />property legally described as follows: <br />(See Attached Exhibit A) <br />WHEREAS, the Planning Commission has reviewed said site plan and conditional use permit at a <br />duly called Public Hearing on May 23, 2019 and recommends approval subject to the conditions <br />listed; <br />NOW, THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF THE CITY <br />OF HUGO, MINNESOTA, that it should and hereby does approve the request by Classic <br />Construction, Inc. for the site plan and conditional use permit, subject to the following conditions: <br />1. A site plan is approved to allow the construction of a 9,948-square foot daycare facility, in <br />accordance with the architectural, civil and lighting plans received on March 29, 2019 and <br />revised on April 26, 2019 and May 1, 2019 except as amended by this resolution. <br />2. The site plan approval is contingent upon approval of the requested easement vacation. <br />3. A site plan modification would be required if additional parking is constructed in the future. <br />4. The development agreement must be executed. <br />5. The cost of landscaping for the daycare facility must be included in the development <br />agreement. The developer must provide a copy of the landscaping cost estimate to city staff. <br />6. Development of Parcel C will be contingent upon providing cross access over the deeded <br />private road easement between the Apple Academy site and Parcel C. <br />7. Prior to issuance of building permits: <br />a. A lot combination for Parcel A and Parcel B must be filed at Washington County. <br />b. The proper drainage and utility easements must be dedicated over the lot after the <br />easement vacation is approved. This must include a drainage and utility easement over <br />the entire stormwater pond that connects to the existing storm water easement on the <br />property directly north of the Parcel B. The proposed easement to access the stormwater <br />system within the TGK site will be provided to the City. <br />
The URL can be used to link to this page
Your browser does not support the video tag.