My WebLink
|
Help
|
About
|
Sign Out
Home
2019.07.15 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2019 CC Packets
>
2019.07.15 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2020 1:42:19 PM
Creation date
7/11/2019 3:36:18 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
7/15/2019
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
63 <br />0 <br />U <br />C7 <br />Z <br />W <br />m <br />U) <br />ID <br />0 <br />0 <br />N <br />W <br />co <br />F- <br />LU <br />W <br />t— <br />W <br />r_ <br />wsb <br />July 11, 2019 <br />Mr. Brian Bear <br />City of Hugo <br />14669 Fitzgerald Avenue North <br />Hugo, MN 55038 <br />Re: Change Order No. 1 <br />Water Tower No. 4 <br />City of Hugo, MN <br />WSB Project No. 03288-190 <br />Dear Mr. Bear <br />The attached Change Order No. 1 includes two credits for the following changes to the contract <br />for the above referenced project: <br />1. A deduction of $7,000 from the contract amount to replace the specified American Flex- <br />Lok Joint for the 16" influent watermain with a Mega -Lug Series 1100 fitting. This fitting <br />will provide the same benefits as the specified fitting but at a lower price. <br />2. A deduction of $15,000 from the contract amount to blast and prime the tank steel in the <br />contractor's shop in Clive, Iowa instead of doing this work on site. This will require KLM <br />(inspection company working for WSB) to provide up to three trips to inspect the blasting <br />and priming work in the contractor's shop for a total cost of $9,666. This change will <br />provide an overall net savings of $5,034 ($15,000 deduct minus $9,666 add for shop <br />inspections) while the work will be inspected in the shop. <br />We recommend accepting this change order. If the City is in agreement, please sign the attached <br />Change Order No. 1 and return one copy to WSB. <br />Sincerely, <br />Mark Erichson, PE <br />Sr. Project Manager <br />Enclosures <br />cc: Scott Anderson <br />Mike Loeffler <br />kkp <br />K103288-1901AdminlConstruction AdminlChange Orders103288-190 LTR C01 to City 071119.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.