My WebLink
|
Help
|
About
|
Sign Out
Home
2019.07.15 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2019 CC Packets
>
2019.07.15 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2020 1:42:19 PM
Creation date
7/11/2019 3:36:18 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
7/15/2019
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Water Tower No. 4 July 2, 2019 <br />WSS PROJECT NO.: 3288-190 <br />OWNER: <br />City of Hugo <br />14669 Fitzgerald Avenue North <br />Hugo, MN 6503E <br />CONTRACTOR: <br />CBSI LLC <br />14109 S. Route 59 <br />Plainfield, It. 605" <br />YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENT DESCRIPTION: <br />1. Deduct $7,000.00 - Replace the American Flex-Lok Joinet with the Mega -Lug Series 1100 Connections (3) required <br />2. Deduct $15,000.00 - Change to shop blast and shop prime in lieu of field blast and field prime <br />IT IS UNDERSTOOD THAT THIS CHANGE ORDER INCLUDES ALL ADDITIONAL COSTS AND TIME EXTENSIONS WHICH ARE IN ANY WAY, SHAPE, OR <br />FORM ASSOCIATED WITH THE WORK ELEMENTS DESCRIBED ABOVE. <br />CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIME: <br />ORIGINAL CONTRACT PRICE: <br />$3,510,500.D0 <br />ORIGINAL CONTRACT TIME: <br />NONE <br />PREVIOUS CHANGE ORDERS: <br />$0.00 <br />NET CHANGE FROM PREVIOUS CHANGE ORDERS: <br />NONE <br />CONTRACT PRICE PRIOR TO THIS CHANGE ORDER: <br />$3,510.500.00 <br />CONTRACT TIME PRIOR TO THIS CHANGE ORDER: <br />NONE <br />NET INCREASEiDECREASE OF THIS CHANGE ORDER: <br />-$22,000.00 <br />NET INCREASE OF CHANGE ORDER: <br />NONE <br />CONTRACT PRICE WITH ALL APPROVED CHANGE ORDERS: <br />$3,488,500.00 <br />CONTRACT TIME WITH APPROVED CHANGE ORDERS <br />NONE <br />RECOMMENDED BY: <br />APPROVED BY: <br />__ - t!.r�7i�7lltil <br />GREG F.,JOHNSOW PE, PROJECT MANAGER <br />TRACTOR SIGNATURE <br />WSB <br />ENGINEER <br />APPROVED BY: <br />-;5� <br />CITY ENGINEER <br />uIy IO.2019 <br />DATE <br />CB8,1 LCC <br />CONTRACTOR f <br />CITY ADMINISTRATOR <br />DATE . <br />X-iW288.19014dmlfi"W&uetlon A& Mx*eeye OrderrWhMD Order No.1SCheryp Order No.1- Hugo 6ftW rowvN& IC01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.