My WebLink
|
Help
|
About
|
Sign Out
Home
2019.09.05 CC Packet - Midyear Budget Workshop
Hugo
>
City Council
>
City Council Agenda/Packets
>
2019 CC Packets
>
2019.09.05 CC Packet - Midyear Budget Workshop
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2020 1:34:32 PM
Creation date
9/4/2019 11:14:03 AM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
9/5/2019
Meeting Type
Work Session
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF <br />30 Clearwater Creel* <br />MT.1906 Preferred Cancet Plan <br />! LEGEND <br />Pedestrian Trail (aggregate or paved). <br />Boardwalk .. , - <br />WlnterTrell <br />. / Waterway _ <br />7 Bridge <br />Existing CRY Trail r_ <br />Proposed Trail <br />ifiYF <br />FUTURE ROAD STRAIL CONNECTION 140TH ST,I <br />Access Pcmt <br />[ PARKING LOT! <br />TRAILHEAD <br />r SHELTER j - _ FUTURE <br />STORMWATER POND <br />i <br />:k <br />17. <br />, <br />EXISTING] <br />TRAIL <br />ACCESS <br />• I <br />r <br />POTENTIAL FUTURE <br />EXPANSION AREA <br />I <br />v <br />ti <br />t: <br />- SIMPLE BOARDWALK STRUCTURAL BOARDWALK <br />EXIS7i _ <br />PARKING 6 • � - - -. pp <br />ACCESS <br />� V �t 1 <br />NOTES: <br />v �, •Park entrance off of future 140th Street Extension <br />r r -Parking lot <br />-Park & trail map (trailhead) <br />-Open space <br />-Small picnic shelter ti F <br />• Main park entrance off Fable Hill Circle North <br />remains �x <br />r -Parking (existing) . <br />• �6,. •�. -Park and trail map (trailhead) ttie� s�'r'..• <br />= • Trail connection to Fenway Blvd trail <br />PLAN + W. • Several loop trails / boardwalk system east antl - <br />i west sides of creek with trail maps <br />®• Several seating / overlooks along trails OVERLOOK <br />) • Pedestrian bridge on north and south and of the <br />park to cross the creek <br />e=• • F•• • West trail to connect to future residential <br />development and trail north of 140th Street <br />• Park trails connect to future trail along 140th Street <br />• Existing policies regarding dogs, horses, & hunting <br />remain unless conflicts arise —9900 <br />ri;�A&SB <br />011947-000 1 September 19, 2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.