My WebLink
|
Help
|
About
|
Sign Out
Home
2019.02.20 Parks Packet
Hugo
>
Community Development
>
Parks
>
Parks Commission
>
Parks Commission Agenda/Packets
>
2019
>
2019.02.20 Parks Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2020 2:16:35 PM
Creation date
10/2/2019 10:52:50 AM
Metadata
Fields
Template:
Commissions
Meeting Date
2/20/2019
Document Type
Agenda/Packets
Commission Name
Parks
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Description: The City of Hugo is looking to put together a feasibility study to complete missing trail connections between Highway 61 and Fenway <br />Boulevard along and near 130th Street. There is an existing north -south trail on Fenway Boulevard and there will be a trail constructed in 2019 on 130th <br />Street east of Highway 61. This is part of the alternate alignment identified with the Hardwood Creek Regional Trail Master Plan. The feasibility study will <br />also include a segment of the HCRT. <br />How will you sustain the project/initiative or policy beyond SHIP funding? The feasibility study will make it possible to construct the missing trail <br />connections. <br />Specific Activities Proposed ' Expected Outcomes: <br />Activities that will lead to expected What are the expected results or outcomes for the specific activities <br />outcomes. listed on the left? What is measurable as a result of the activity? How <br />many individuals or organizations do you expect to reach through this <br />Hire WSB to prepare the trail feasibilitv study <br />activity? <br />Hire Consultant to undertake a design feasibility study for a trail segment along <br />130th street from Fenway Blvd North to Highway 61 in anticipation of a trail <br />connection to a proposed trail along 130th Street east of 61. This proposed trail <br />will connect new and existing residents east of 61 to the existing trail along <br />Fenway. The study will also include the study of trail segment from the existing <br />Fenway Trail at 130th Street and extending south to connect up with Falcon Court <br />and the future Hardwood Creek Regional Trail to run parallel to the railroad line a! <br />an alternate route for the HCRT. <br />Preliminary design will include a project start-up meeting with the City of Hugo, <br />and potentially the County, to review the project schedule, key timelines and <br />project outcomes. An initial site inventory and analysis will be conducted in order <br />to identify opportunities and constraints, along with review and discussion of <br />previous plans and studies. Preliminary trail routes and options will be prepared to <br />illustrate trail types and locations. <br />Completion Budget <br />Date for Provide a budget for <br />Activity: each activity and <br />description of how <br />those funds will be <br />If you need assistance due to disability or language barrier please call 651-430-6001 (TTY 651-430-6246) <br />AN EQUAL EMPLOYMENT OPPORTUNITY / AFFIRMATIVE ACTION EMPLOYEE 12/18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.