Laserfiche WebLink
Image Placeholder <br />ACOMPREHENSIVE SANITARY <br />SEWER PLAN <br />2040 COMPREHENSIVE PLAN UPDATE DRAFT Dec14-17 <br />for review only <br />Table 11-5 Existing Lift Station Analysis <br />Lift Station <br />Area <br />Pumping <br />Capacity (gpm) <br />Existing <br />Peak Hour <br />Inflow (gpm) <br />Remaining <br />Pumping <br />Capacity <br />(gpm) <br />1 380 66 314 <br />2 400 189 211 <br />3 190 38 152 <br />4 350 59 291 <br />5 100 20 80 <br />6 120 56 64 <br />7 100 11 89 <br />8 200 74 126 <br />9 515 91 424 <br />10 90 15 75 <br />Individual Sewage Treatment Systems (ISTS) <br />The City currently has 1,078 ISTS within its boundary that are constructed and maintained privately� Washington County monitors and inspects <br />these systems� The areas are primarily located in the districts in the northern and eastern parts of the City� The existing septic systems are <br />scattered within the existing and proposed urban service area� The locations of the ISTS are featured in Map 10-3�