My WebLink
|
Help
|
About
|
Sign Out
Home
2017.12.20 Parks Packet
Hugo
>
Community Development
>
Parks
>
Parks Commission
>
Parks Commission Agenda/Packets
>
2017
>
2017.12.20 Parks Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2019 12:00:47 PM
Creation date
10/2/2019 11:04:01 AM
Metadata
Fields
Template:
Commissions
Meeting Date
12/20/2017
Document Type
Agenda/Packets
Commission Name
Parks
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
306
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Image Placeholder <br />ACOMPREHENSIVE SANITARY <br />SEWER PLAN <br />2040 COMPREHENSIVE PLAN UPDATE DRAFT Dec14-17 <br />for review only <br />Forest Lake Interceptor <br />The Forest Lake Interceptor (7029) is a combination forcemain and gravity sewer interceptor, which flows southward from Forest Lake, through <br />Hugo, White Bear Lake, North Oaks, and Vadnais Heights before entering MCES Interceptor 7132� <br />There are several lift stations along the length of the interceptor, two of which are in Hugo� MCES Lift Station No� 2 is located on the City of <br />Hugo’s north border at 180th Street North� MCES Lift Station No� 3 is located adjacent to CSAH 8 at Oneka Parkway� The capacity of MCES Lift <br />Station No� 2 is 2,600 gpm or 3�74 MGD, and the capacity of MCES Lift Station No� 3 is 3,400 gpm or 4�90 MGD� <br />The interceptor enters the City of Hugo and MCES Lift Station No� 2 as a 36-inch reinforced concrete pipe (RCP) gravity sewer� The interceptor <br />exits MCES Lift Station No� 2 with approximately 3,500 feet of 18-inch ductile iron pipe (DIP) forcemain before transitioning back to 36-inch RCP <br />gravity sewer� The 36-inch RCP increases in size to a 42-inch RCP gravity sewer near 170th Street North and remains 42 inches in diameter <br />through the City of Hugo except for approximately 2,350 feet of 24-inch DIP forcemain between MCES Lift Station No� 3 and the 42-inch <br />interceptor on 142nd Street North� <br />MCES has identified an extensive Capital Improvement Plan (CIP) related to the Forest Lake Interceptor in response to growth within the region. <br />There are improvements programmed for the facilities between Hugo and the MCES WWTP over the next ten years� There are currently projects <br />that are under construction or in the planning stages consistent with the CIP� <br />Interceptor 76-51 (The Centerville Interceptor) intersects with and flows into the Forest Lake Interceptor near MCES Lift Station No. 3 in Hugo. <br />This interceptor collects flows from the Cities of Hugo, Lino Lakes, and Centerville.
The URL can be used to link to this page
Your browser does not support the video tag.