My WebLink
|
Help
|
About
|
Sign Out
Home
2017.12.20 Parks Packet
Hugo
>
Community Development
>
Parks
>
Parks Commission
>
Parks Commission Agenda/Packets
>
2017
>
2017.12.20 Parks Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2019 12:00:47 PM
Creation date
10/2/2019 11:04:01 AM
Metadata
Fields
Template:
Commissions
Meeting Date
12/20/2017
Document Type
Agenda/Packets
Commission Name
Parks
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
306
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Image Placeholder <br />ACOMPREHENSIVE SANITARY <br />SEWER PLAN <br />2040 COMPREHENSIVE PLAN UPDATE DRAFT Dec14-17 <br />for review only <br />2040 Sanitary Sewer Districts <br />District A <br />Additional trunk sanitary sewer main improvements will be required <br />following the connections of all the existing homes in Sub-districts <br />A1 and A2 that are currently on private septic systems� Additional <br />improvements will also be required if the Oneka Ridge Golf Course is <br />re-developed in the future� Trunk system improvements will include <br />the extension of a 12-inch trunk sanitary sewer from the MCES <br />Interceptor Sewer to the east to serve Sub-district A2 by gravity <br />main� Trunk system improvements for Sub-district A3 include the <br />construction of Trunk Lift Station A3 with a minimum pumping capacity <br />of 425 gpm and the extension of a 10-inch trunk sanitary sewer from <br />Sub-district A2� <br />District D <br />No additional trunk sanitary sewer main improvements will be required <br />following the connections of all the existing homes and possible <br />redevelopment of Sub-district D1 that are currently on private septic <br />systems� However, system improvements required will include the <br />extension of an 8-inch sanitary sewer to the northwest to serve Sub- <br />district D1 by gravity main� This sanitary sewer main will be directed <br />to the existing Lift Station No� 10 prior to entering Sub-district D2 and, <br />ultimately, the MCES interceptor at connection point D1� <br />District E <br />Trunk sanitary sewer main improvements will be required following the <br />possible development of Sub-district E4 and additional sanitary sewer <br />improvements will be required following the development of Sub- <br />districts E5, E6, and E7 that are currently not serviced by the trunk <br />sanitary sewer system� Trunk system improvements will include the <br />construction of new 8-inch sanitary sewers to serve Sub-district E4, <br />as well as the extension of 8-inch sanitary sewers within Sub-district <br />E5 which will be directed to the existing sewer within Sub-district E3� <br />Additional sanitary sewer improvements for Sub-districts E6 and E7 <br />will include the installation of 8-inch sanitary sewer directed to Lift <br />Station No� 4 located in Sub-district E7 prior to entering Sub-district E3 <br />and eventually entering the MCES interceptor at connection point E1� <br />The development and expansion of sewer service into District E will <br />require flows from Sub-districts E4, E6, and E7 to be serviced by <br />Lift Station No. 4. The peak flows generated from these districts are <br />projected to be within the current capacity of Lift Station No� 4� At <br />such a time that development occurs in District V outside of the 2040 <br />MUSA, the trunk sewer main within District E2 along 130th St N <br />would need to be reconstructed to a 42-inch diameter trunk main from <br />Highway 61 to the MCES interceptor� Lift Station No� 4 would need <br />to be reconstructed to a capacity of 9,600 gpm with the addition of a <br />forcemain from the existing lift station location to Highway 61� <br />District G <br />No additional trunk sanitary sewer main improvements will be required <br />following the possible development of Sub-district G1 that is currently <br />not serviced by the trunk sanitary sewer system� To expand sewer <br />service into Sub-district G1, system improvements will be required and <br />include the extension of 8-inch sanitary sewers to the west and south <br />from Sub-district G2 to serve Sub-district G1 by gravity main, which <br />will then outlet to the MCES interceptor at connection point G1�
The URL can be used to link to this page
Your browser does not support the video tag.