Laserfiche WebLink
Image Placeholder <br />ACOMPREHENSIVE SANITARY <br />SEWER PLAN <br />2040 COMPREHENSIVE PLAN UPDATE DRAFT Dec14-17 <br />for review only <br />District I <br />Additional trunk system improvements following the development of <br />Sub-District I1 include the extension of a 10-inch trunk main to the <br />service area� No additional trunk sanitary sewer main improvements <br />will be required following the possible development of Sub-districts I5 <br />and I6 that are currently not serviced by the sanitary sewer system� <br />However, system improvements will be required and include the <br />extension of 8-inch sanitary sewers within each sub-district to serve <br />each by gravity main. A portion of Sub-district I1 wastewater flows <br />will be directed to Sub-district I2 and eventually outlet to the MCES <br />interceptor at connection point I1. Sub-district I5 wastewater flows <br />will be directed to Sub-district I4� The extension of sanitary sewer to <br />Sub-districts I5 and I6 would result in the total peak flows entering <br />Lift Station No� 2 exceeding the capacity of the lift station� Thus, the <br />capacity of Lift Station No� 2 pumps would need to be upgraded from <br />400 gpm to at least 420 gpm before total sewer service expansion into <br />Sub-districts I5 and I6� Sub-district I6 sanitary sewer improvements <br />will consist of the extension of an 8-inch sanitary sewer and the <br />construction of Lift Station I6 with a minimum pumping capacity of <br />115 gpm. Wastewater flows from this lift station will then be directed <br />to Sub-district I4 prior to entering the MCES interceptor at connection <br />point I1� <br />District J <br />To serve the future commercial and low density residential in Sub- <br />district J5, the extension 8-inch sanitary sewers will be required, which <br />can connect to the existing 10-inch trunk sewers in Sub-districts J2 <br />and J4� <br />District K <br />An 8-inch sanitary sewer will be expanded to serve the future <br />medium density residential Sub-district K3. This district’s flows will <br />be connected to and flow into existing extension sewer lines in Sub- <br />district K2� To serve the future low density residential Sub-district K6, <br />the extension of 8-inch sanitary sewer will be required from Sub-district <br />K4� <br />District L <br />No additional trunk sanitary sewer main improvements will be required <br />following the possible development of Sub-districts L2 and L3 that is <br />currently not serviced by the trunk sanitary sewer system� However, <br />system improvements will be required and include the extension of <br />8-inch sanitary sewers to the east from Sub-district L1 to serve Sub- <br />district L2 by gravity main� Sub-district L3 improvements will include <br />the extension of an 8-inch sanitary sewer from the MCES Interceptor <br />Sewer� <br />District M <br />No additional trunk sanitary sewer main improvements will be required <br />following the possible development of Sub-districts M2 and M3, <br />currently not serviced by the trunk sanitary sewer system� However, <br />system improvements will be required and include the extension of <br />8-inch sanitary sewers to the south and east from Sub-district M1 to <br />serve the districts by gravity main� <br />District N <br />Trunk sanitary sewer main improvements will be required following <br />the possible development of Sub-district N1 and additional sanitary <br />sewer improvements will be required following the development of <br />Sub-district N7, currently not serviced by the trunk sanitary sewer <br />system� Trunk system improvements for Sub-district N1 will include <br />the construction of Lift Station N1 with a minimum pumping capacity <br />of 220 gpm and the extension of a 10-inch trunk sanitary sewer from <br />Sub-district N4� <br />System improvements will include the extension of 8-inch sanitary <br />sewers to the north to serve the eastern portion Sub-district N3 by <br />gravity main which will be directed to the existing Lift Station No� 8 <br />located within Sub-district N2� Additional sanitary sewer improvements <br />for Sub-district N7 will include the installation of 8-inch sanitary sewer <br />directed to Sub-district N6 prior to entering the MCES interceptor at <br />connection point N1� Service to Sub-district N8 will be accomplished <br />through the extension of 8-inch sanitary sewer from Sub-districts N6 <br />and N9�