My WebLink
|
Help
|
About
|
Sign Out
Home
2017.11.15 Parks Packet
Hugo
>
Community Development
>
Parks
>
Parks Commission
>
Parks Commission Agenda/Packets
>
2017
>
2017.11.15 Parks Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2020 3:36:31 PM
Creation date
10/2/2019 11:15:05 AM
Metadata
Fields
Template:
Commissions
Meeting Date
11/15/2017
Document Type
Agenda/Packets
Commission Name
Parks
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
dedication or request for PUD flexibility. The park currently has a layout that shows <br />parking and loading areas, a pavilion, playground space, two sport courts, ballfields, and <br />trail connections. Staff has reviewed the park site plan. The plan has done a good job of <br />preserving wetlands and some existing trees which would expand the greenway corridor. <br />A greenway trail through the open space in the park to provide access to these areas is <br />desirable. Ball fields, open play areas, and other park facilities which are not available at <br />nearby existing parks are desirable. Because of the wetlands on the site, additional work <br />will need to be done to ensure that park facilities are built on suitable upland. Staff <br />would like to see that the parking areas be located near the facilities and be sized <br />according to their use. It is also very important that there be strong trail connections <br />between the residential areas and the park. <br />4. PARK DEDICATION REQUIREMENTS: <br />The developer is required to dedicate land, or pay a fee, or a combination of land and a <br />fee. For the 117.5 acre site, parkland dedication of 9.36 acres of upland is required. The <br />developer may also pay the fee, which is currently $2,400 per unit. The parkland <br />dedication fee for the proposed 177 lots would be $424,800. The developer is proposing <br />land dedication in lieu of fees with 11.2 acres of land. <br />5. CONCLUSION: <br />No formal action is required at this time. The developer is requesting informal <br />comments on the sketch plan. <br />The applicant has indicated that they would be interested in dedicating land to meet the <br />park dedication requirements. Although, there is significant open space shown on the <br />plan, only buildable and usable land is accepted for park dedication credit. <br />The Parks Commission should provide comments on the proposed park, greenway <br />corridor, as well as the trail and sidewalk connections in the development. <br />ATTACHMENTS: <br />1. Location Map <br />2. Leroux Property Concept Plan dated 9/20/17 <br />3. City of Hugo Trail and Sidewalk Plan <br />4. City of Hugo Neighborhood Park Service Areas Map <br />-3- <br />November 15, 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.