My WebLink
|
Help
|
About
|
Sign Out
Home
2017.10.18 Parks Packet
Hugo
>
Community Development
>
Parks
>
Parks Commission
>
Parks Commission Agenda/Packets
>
2017
>
2017.10.18 Parks Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2020 3:37:00 PM
Creation date
10/2/2019 11:15:23 AM
Metadata
Fields
Template:
Commissions
Meeting Date
10/18/2017
Document Type
Agenda/Packets
Commission Name
Parks
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
park dedication fee is $2,400 per unit. At this time, the developer has indicated that they <br />would be dedicating a combination of land and fee. <br />The developer has indicated that there is approximately 83 acres of buildable land, <br />therefore 8.3 acres of park land would be required to be dedicated. Wetlands, <br />disconnected, or otherwise unusable parcels are not considered for park dedication. The <br />developer has indicated that they would be dedicating the open space adjacent to Oneka <br />Lake. In addition to that, they are proposing to construct a fishing pier/dock to provide <br />access to Oneka Lake. <br />A fee could be considered by the Park Commission in lieu of park land dedication. For <br />Creekside Heights, the developer has indicated that there would be 251 total units. At the <br />current fee of $2,400 per unit, the park dedication fee would total $602,400. <br />5. CONCLUSION: <br />No formal action is required at this time. The developer is requesting informal <br />comments on the sketch plan. <br />Park Dedication Proposal: Unknown <br />Staff has not received a proposal for park dedication. The applicant has indicated that <br />they would be interested in dedicating a combination of land and fee to meet the <br />requirements. Although there is a significant amount of open space shown on the plan, <br />only buildable and usable land is accepted for park dedication credit. <br />The developer has indicated an interest in building a fishing pier on Oneka Lake, to be <br />dedicated to the City of Hugo and made publically available. The Parks Commission <br />should provide input on what amenities the access should have and how it could be used <br />by the public. <br />The Parks Commission should comment on the trail and sidewalk connections in the <br />sketch plan. Specifically: <br />• Pedestrian crossing at Highway 61 <br />• Access to Oneka Lake <br />• Trail connections to the existing neighborhood to the south and other possible <br />residential neighborhoods in the surrounding areas <br />• Connections to Oneka Lake Park <br />• Pedestrian crossing at Highway 61 <br />-3- <br />Lincoln Group <br />October 18, 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.