My WebLink
|
Help
|
About
|
Sign Out
Home
2019.12.02 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2019 CC Packets
>
2019.12.02 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2020 1:25:34 PM
Creation date
11/27/2019 10:53:42 AM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
12/2/2019
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WBL School District Transportation Facility CUP <br />Page 5 <br />asked for further clarification on circulation throughout the site and has asked the applicant to <br />create an emphasis on interior circulation. Staff has also asked for a plan showing bus movements. <br />Per the engineer's comments, the northern entrance is appropriately aligned with 134th Street North <br />and the proposed southern entrance is directly adjacent to the access for the property to the south. <br />Staff would like to better understand the circulation needs within the site to determine if the <br />southern entrance can be relocated or eliminated. <br />Parking <br />According to the Section 90-253 Parking and Loading, based on the use and the size of the building <br />the required number of parking spaces for the 15,000 square foot building is 65. The applicant is <br />proposing 110 parking spaces to accommodate the estimated number of staff. The proposed <br />parking spaces exceed the ordinance requirements. <br />Trails <br />There is a City trail along Fenway Boulevard North. The applicant is not proposing any sidewalks <br />or trails with this development. <br />Building Architecture <br />The sketch plan review application does not require elevations of the building. The applicant has <br />submitted images of similar projects and has stated that the materials will likely be a mix of <br />integrally -colored split -face rock, brick, precast panels, glass, and metal as an accent. The <br />materials will be of a cohesive color scheme that is compatible with the surrounding uses. The <br />applicant is aware that the building will have to meet the Commercial and Industrial Design <br />Guidelines. The Commercial and Industrial Design Guidelines includes using four sided design, <br />the use of high quality durable materials, and having a clearly defined and visible entrance. Staff <br />will evaluate the final design, building materials, and color palette once a site plan application is <br />submitted. <br />Signage <br />The applicant is not showing any signage at this time. The applicant will be required to submit a <br />sign permit application and gain staff approval should they want to install a sign. <br />Drainage/Grading <br />The applicant has stated that there is an existing pond used for stormwater management that was <br />developed in 2006 that will be incorporated into the design. Additional stormwater management <br />is likely required. The applicant will need to obtain a permit from the City for their Stormwater <br />Management Plan within the site that includes the appropriate storage, rate control, treatment, and <br />volume reduction. There is a high likelihood that the site can support water reuse and this should <br />be explored in greater detail upon site plan submittal. <br />
The URL can be used to link to this page
Your browser does not support the video tag.