Laserfiche WebLink
4.4 Right-of-Way/Easements <br />There is little right-of-way along Goodview Avenue; however, proposed improvements will be completed <br />within those areas or where the City has prescriptive rights, so no acquisitions are proposed at this time. <br />4.5 Permits/Approvals <br />The anticipated permits and approvals required, and the respective regulatory agencies are listed below: <br />■ City of Hugo........................................................................... RCWD Permit/Wetlands <br />■ MN Pollution Control Agency NPDES........................................... Erosion/Stormwater <br />4.6 Construction Access/Staging <br />The contractor will be responsible for providing access to all properties throughout the project. The <br />proposed methods of pavement rehabilitation will typically allow residents to drive on the roadway surface <br />during construction. Adequately signed detours will be identified to direct traffic around the construction <br />zones and notify users of the increased truck and construction activity. Detours will be used only if <br />absolutely necessary to ensure the safety of residents and construction workers alike. <br />5. FINANCING <br />5.1 Opinion of Probable Cost <br />A detailed opinion of probable cost is included in Appendix B of this report. The opinion of probable cost <br />is based on projected construction costs for 2020 and includes a 10% contingency and 25% indirect <br />costs. The indirect costs include engineering, legal, and administrative costs associated with the project. <br />The project costs are summarized as follows: <br />2020 Goodview Avenue Improvement Project <br />Option 1: Street Improvements — Match Existing Pavement Width (24-foot) <br />Cost Summary <br />Street Improvements <br />$1,195,000 <br />Drainage Improvements <br />$125,000 <br />TOTAL <br />$1,320,000 <br />2020 Goodview Avenue Improvement Project <br />Option 2: Street Improvements — Widen Roadway (26-foot) <br />Cost Summary <br />Street Improvements <br />$1,415,000 <br />Drainage Improvements <br />$125,000 <br />TOTAL <br />$1,540,000 <br />Feasibility Report <br />2020 Goodview Avenue Improvement Project <br />City of Hugo, MN <br />WSB Project No. R-014873-000 <br />Page 5 <br />