Laserfiche WebLink
Resolution 2020-8 <br /> Page 2 <br /> 7. The preliminary phasing plan is generally approved per plans dated October 22, 2019. <br /> The phasing plan shall be revised to include all improvements, such as stormwater <br /> management and trails. Any major revisions to the phasing plan shall require PUD <br /> amendment. Minor modifications shall be reviewed and approved by staff. <br /> a. Phase 1 shall include: <br /> i. Access to Egg Lake Road (CSAH 8) shall be reviewed and <br /> approved by Washington County. A permit for the connection shall <br /> be issued. <br /> ii. A neighborhood gathering space central to the overall <br /> development, including amenities. <br /> iii. Street C shall be constructed to the connection of Street B. <br /> b. Phase 2 shall include: N/A <br /> c. Phase 3 shall include: <br /> i. The connection to Egg lake Road (CSAH 8) shall be constructed. <br /> 8. The building setbacks and impervious surface coverage requirements for the PUD are <br /> as follows: <br /> R-3 55' Wide <br /> Zoning Lots <br /> District <br /> Front Setback 30 Ft 30 Ft <br /> (min) <br /> 25 Ft - side of home on <br /> a corner lot and lots <br /> 18,19, and 2,Block 4 <br /> 20 Ft—for existing home <br /> on Lot 1,Block 1 <br /> Side Setback 10 Ft 7.5 Ft <br /> (min) <br /> Rear Setback 30 Ft 30 Ft <br /> (min) <br /> Lot Impervious 50% 55% <br /> (max) <br /> 9. A stormwater re-use system, as shown in the plans, shall be constructed with the <br /> development. The final plans shall be reviewed and approved by staff. The system <br /> will be installed by the applicant, and owned/operated/maintained by the <br /> homeowner's association. A stormwater reuse agreement shall be reviewed an <br /> approved by staff and recoded at Washington County. <br />