My WebLink
|
Help
|
About
|
Sign Out
Home
2019.06.03 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2019 CC Packets
>
2019.06.03 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2020 10:17:45 AM
Creation date
6/26/2020 10:10:04 AM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
254
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Adelaide Landing 4th Addition 22 <br />Said fee shall be due for each of the 20 lots within the Plat (i.e. total due $22,560.00). <br /> <br /> h) Cul-de-sac Escrow. N/A <br /> <br /> i) Escrow for Street Signage. Developer shall deposit $0 into an <br />escrow account with the City. This amount represents an estimated cost of $500/sign for 0 sign to <br />be installed within the development. <br /> <br /> j) WCA Escrow. N/A <br /> <br /> k) Sanitary Sewer Trunk Fee. The Developer shall pay the City a sanitary <br />sewer trunk fee in the amount of $32,640.00. This sum is calculated to be $1,632 per lot for the 20 <br />residential lots within this phase. <br /> <br /> l) Water Trunk Fee. The Developer shall pay the City water trunk fee in the <br />amount of $23,520.00. This sum is calculated to be $1,960 per lot, with credit provided for the <br />stormwater reuse/irrigation system based on the anticipated reduction in water demand. The <br />reduction is calculated at 40%, resulting in a trunk water fee amount of $1,176 per lot. The total is <br />based on the reduced per unit fee applied to the 20 lots in the plat. <br />
The URL can be used to link to this page
Your browser does not support the video tag.