My WebLink
|
Help
|
About
|
Sign Out
Home
2019.06.03 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2019 CC Packets
>
2019.06.03 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2020 10:17:45 AM
Creation date
6/26/2020 10:10:04 AM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
254
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Adelaide Landing 4th Addition 21 <br /> <br />EXHIBIT C <br /> <br />ESCROWS, FEES AND CHARGES <br /> <br /> <br /> a) Escrow for City Costs and Fees. The Developer shall deposit <br />sufficient escrow with the City as outlined in Section A. 1. The required beginning balance in the <br />account is calculated at $19,825. This sum is calculated to be four percent (4%) of the estimate of <br />the required Improvements to be installed to serve the development, plus $5,000 which is the <br />minimum balance required in the account. <br /> <br /> b) Cash Escrow or Letter of Credit. The Developer shall provide a <br />financial guarantee to the City, in the form of a cash escrow or letter of credit, in the amount equal <br />to one hundred twenty-five percent (125%) of the estimated amount of the required Improvements. <br />This amount has been calculated by the City Engineer to be $463,267. This amount may be <br />reduced upon request of the Developer and approved by the City. At no point shall the Letter of <br />Credit be reduced below ten percent (10%) of the original amount. The City shall have the right to <br />retain the financial guarantee until the Imp rovements have been completed to the satisfaction of the <br />City and the warranty period has expired. <br /> <br /> c) Storm Water Trunk Fee. The Developer shall pay the City a Storm <br />Water Trunk Fee in the amount of $15,439. This sum is calculated to be $0.07 per square foot for <br />the 232,160 square feet of net developable area within the Plat, with credit provided for the <br />stormwater reuse/irrigation system based on the anticipated reduction in water demand. The <br />reduction is calculated at 5%. This fee shall be paid before the Plat is signed by the City. <br /> <br /> d) Storm Water Ponding Fee. The storm water ponding requirement has <br />been met by the Developer through the incorporation of on-site ponding. No storm water ponding <br />fee will be applied. <br /> <br /> e) Snow Plowing. The Developer agrees to pay a one-time lump sum <br />cash escrow to the City to cover the cost of snow plowing the roads within the plat, during the first <br />snow season, before the roads are formally accepted by the City of $.50 per lineal foot. The <br />Developer shall post a cash escrow with the City in the amount of $400 ($0.50 x 800 = $400). <br /> <br /> f) Sealcoating. The Developer shall post a one-time lump sum cash <br />escrow with the City in the amount of $3,200 to cover the cost of the first sealcoating of the streets <br />in the Plat. This sum is calculated to be $4.00 per foot for the 800 feet of streets within the Plat. <br /> <br /> g) Park Dedication. The Developer agrees to pay a park dedication fee <br />of $1,128 per lot for residential development payable before the final plat is signed by the City.
The URL can be used to link to this page
Your browser does not support the video tag.