My WebLink
|
Help
|
About
|
Sign Out
Home
2019.06.03 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2019 CC Packets
>
2019.06.03 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2020 10:17:45 AM
Creation date
6/26/2020 10:10:04 AM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
254
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />Apple Academy 4 <br />8:00 a.m. and 5:00 p.m. on Saturdays; at no time on Sundays or holidays. <br /> g) Street Sweeping: Developer shall sweep and/or otherwise clean all <br />streets, as needed, within and adjacent to the Development property as a result of construction <br />activities associated with the site plan until final acceptance of the improvements. If the streets are <br />not maintained in a manner acceptable to the City, the City will arrange for the street sweeping at <br />Developer’s cost. <br /> <br /> 6. Project Completion: All work for improvements listed herein on Exhibit A, shall be <br />completed subject to the approval of the City in accordance with the approved plans. All <br />improvements shall be substantially completed to the reasonable satisfaction and approval of the City <br />within twelve (12) months of the execution of this agreement. Substantial completion shall consist <br />of all work with the exception of placement of the bituminous wear course and completion of the final <br />punchlist. The Developer shall be excused from the strict completion date set forth herein if written <br />notice is received from the Developer of the existence of causes over which the Developer has no <br />control which will delay the completion of the work and approved in writing by the City. In that <br />event, the City may extend the date or dates herein specified. <br /> <br /> 7. Project Acceptance: Final project acceptance will be considered by the City Council <br />once the following have been completed: <br /> <br /> (a) All improvements are installed according to the approved plans. <br /> (b) All punchlist items are completed. <br /> (c) All Record Drawing information has been provided to the City to its <br />satisfaction. <br /> (d) Escrow account for City costs and fees is current in accordance with the <br />provisions of this agreement. <br /> (e) The City receives confirmation via lien waivers that contractors or other <br />parties have been paid for the work completed. <br /> (f) The City receives a written request from the Developer to accept the <br />improvements. <br /> <br /> 8. Record Drawing Requirements and Engineer’s Certification. Following <br />completion of all development activities and prior to the release of security and acceptance of <br />improvements, the Developer and/or their assignee shall provide to the City "as-built" plans for the <br />improvements listed on Exhibit A. This information shall be provided to the City in the following <br />formats <br /> <br /> (a) 1-set mylar drawings (22” x 34”) for all improvements. <br /> (b) 1-set paper drawings (22” x 34”) for all improvements. <br /> (c) Individual Adobe.pdf (or approved equivalent) for all plan sheets and the Final <br />Site Plan.
The URL can be used to link to this page
Your browser does not support the video tag.