My WebLink
|
Help
|
About
|
Sign Out
Home
2019.06.03 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2019 CC Packets
>
2019.06.03 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2020 10:17:45 AM
Creation date
6/26/2020 10:10:04 AM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
254
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />S:\Users\R_Juba\Rachel\DEVELOPMENT PROJECTS\Arcand South\Adelaide Landing\Adelaide Landing 4th Add Final Plat\Engineers Memo Adelaide Landing 4rd FP - <br />053019.docx 178 E 9TH STREET | SUITE 200 | SAINT PAUL, MN | 55101 | 651.286.8450 | WSBENG.COM <br /> <br />May 30, 2019 <br /> <br /> <br />Ms. Rachel Juba <br />City Planner <br />City of Hugo <br />14669 Fitzgerald Avenue North <br />Hugo, MN 55038 <br /> <br />Re: Final Plat Review <br /> Adelaide Landing 4rd Addition <br /> WSB Project No. 013856-000 <br /> <br />Dear Ms. Juba: <br /> <br />We have reviewed the final plat submittal for the above-referenced project. In particular, we have <br />reviewed the following plans related to this particular request: <br /> <br />• Construction Plans for Sanitary Sewer, Watermain, Storm Sewer, and Streets dated <br />03/25/19 by Westwood Professional Services <br />• Storm Sewer Design dated 03/07/2019 by Westwood Professional Services <br />• Adelaide Landing 4th Addition and Phase 2 Grading, Drainage, and Erosion Control Plans <br />dated 04/22/19 <br />• Adelaide 4th Addition Plat <br />• Revised Phasing Plan dated 03/29/2019 <br /> <br />Based on the review of the final plat documents, we offer the following comments related to this <br />application: <br /> <br />Final Plat <br /> <br />1. The final plat is consistent with the preliminary plat documents, and the appropriate <br />drainage/utility easements have been provided within the plat area itself. <br /> <br />2. Drainage and Utility easements shall be placed over all the outlots. <br /> <br />Development Agreement <br /> <br />3. There are a number of development fees outlined within the City’s Fee Schedule that will <br />become due as part of the final plat. The Development Fees are included within Exhibit C of <br />the Development Agreement. <br /> <br /> <br />Grading, Street, and Utility Plans <br /> <br />4. The Approved grading plan allows for the continuation of mass grading outside of the first, <br />second, and third phases. The grading plan reflects the first, second, third and fourth phase <br />boundaries as well as future phases. Grading to the eastern property limits in the <br />southeastern portion of the site has not yet been approved. The development team is <br />required to provide additional survey and confirmation that there will not be any drainage
The URL can be used to link to this page
Your browser does not support the video tag.