Laserfiche WebLink
<br /> <br /> <br /> <br />COMPREHENSIVE STORMWATER MANAGEMENT PLAN <br />CITY OF HUGO <br />WSB PROJECT NO. 1904-610 PAGE 6 <br />4. Infiltrate and Irrigate Lions Park <br />The Lions Park infiltration and irrigation project is currently under design and will consist <br />of pumping water from the Water’s Edge Development stormwater ponds to Lions Park <br />for both infiltration and irrigation. It is anticipated that this project will provide a volume <br />reduction of 35 acre-feet through irrigation and an addition 11 acre-feet through <br />infiltration. Volume reduction credits from this project will generate credits within the <br />Hardwood Creek ROC drainage area. <br /> <br />5. Egg Lake Perimeter Stormwater Reuse System <br />The Egg Lake Stormwater Reuse System project would consist of pumping stormwater <br />runoff from a perimeter pond constructed around Egg Lake for irrigation purposes in <br />selected areas. The estimated benefits of this project include an annual volume reduction <br />of 35 acre-feet. This project will be fully designed when redevelopment projects on the <br />northwest side of Egg Lake become active. Volume reduction credits from this project will <br />generate credits within the Egg Lake ROC Drainage Area. <br /> <br />6. Water’s Edge Water Reuse and Irrigation <br />The Water’s Edge Water Reuse and Irrigation project will consist of pumping water from <br />selected stormwater ponds within the Water’s Edge Development and using this water for <br />irrigation purposes. Phase 1 of this project is complete, and Phase 2 is currently in <br />design/construction. The initial phase of stormwater irrigation included replacing seven <br />irrigation accounts currently using city water with stormwater. Phase 1 irrigated 25 acres <br />of green space and Phase 2 is planned to irrigate 61.1 acres, creating a total of 93.3 <br />credits within the Peltier Lake ROC drainage area when both phases are completed. <br /> <br />7. CSAH 8 City Accounts Irrigation project <br />This project consists of pumping water located north of Frenchman Road and west of <br />Oneka Parkway North and using it for irrigation purposes. The stormwater will replace <br />potable water for six irrigation accounts adjacent to County Road 8 and will be used to <br />irrigate 6.25 acres. The RCWD has awarded the City $150,000 in grants thus far for the <br />development of this project. The preliminary design for this project is underway, and the <br />City Council has approved the creation of a finalized water balance model. It is estimated <br />that, upon implementation, this project will provide 22 acre-feet of volume reduction. <br /> <br />8. Irrigate Clearwater Creek Park <br />This project consists of pumping water from Clearwater Creek and using it to irrigate an <br />80 acre park property located west of Fenway Blvd. and south of 140th Street. This <br />project could be implemented in conjunction with the irrigation project proposed for <br />Harley Sod Fields (which is located immediately north of this parcel). It is anticipated that <br />this would provide a volume reduction of up to 170 acre-feet annually. <br /> <br />9. Irrigate Future Fable Hills Park <br />This project consists of pumping water from a stormwater pond within the Fable Hills <br />Development and using the stormwater to irrigate a planned Fable Hills Park located <br />within the subdivision. The estimated benefits of this project include a volume reduction <br />of 76 acre-feet. <br />