Laserfiche WebLink
<br /> <br /> <br /> <br />COMPREHENSIVE STORMWATER MANAGEMENT PLAN <br />CITY OF HUGO <br />WSB PROJECT NO. 1904-610 PAGE 7 <br />10. Arbre Park Irrigation Project <br />This project consists of pumping water from a pond adjacent to Arbre Park and using this <br />stormwater for irrigation purposes. It is noted that this park is already being irrigated <br />using city water. The estimated benefits for this project include a volume reduction of five <br />acre-feet. <br /> <br />11. Val Jean Park Water Re-use Project <br />This project consists of pumping water from a stormwater pond located adjacent to Val <br />Jean Park and using this water to irrigate the park property. This park is already irrigated <br />with city water. If implemented, this project would provide a volume reduction of up to four <br />acre-feet. <br /> <br />12. Irrigate Public Property around Water’s Edge School <br />This project consists of pumping water from a nearby pond and irrigating 20.9 acres <br />within school property with stormwater. It is estimated that this irrigation project could <br />provide a volume reduction of 45 acre-feet. <br /> <br />13. Heritage Pond Park Water Reuse System <br />This project consists of irrigating and infiltrating approximately 14.7 acres of park land <br />using stormwater within Heritage Pond's Park. The estimated benefits for this project <br />include a volume reduction of 32 acre-feet due to irrigation and an additional three acre- <br />feet due to infiltration. <br /> <br />14. Oneka Ponds Park Water Reuse System <br />This project consists of irrigating and infiltrating stormwater in Oneka Ponds Park by <br />utilizing runoff from the Oneka Ponds Development. The estimated irrigation area is 34 <br />acres of park land and would result in a volume reduction of 84 acre-feet (74 from <br />irrigation and 10 from infiltration). <br /> <br />15. Diamond Point Park Water Reuse System <br />This project consists of constructing a water reuse system to irrigate and infiltrate water in <br />Diamond Point Park. The irrigation area for the project is approximately 12.6 acres, which <br />would result in an estimated volume reduction of 27 acre-feet annually because of <br />irrigation, and an additional 14 acre-feet reduction from infiltration. <br /> <br />16. Rice Lake Soccer Fields Water Reuse System <br />This project consists of irrigating and infiltrating 12 acres of soccer fields and/or City of <br />Hugo Public Works Garage property with stormwater runoff taken from stormwater ponds <br />installed as part of the construction of the City of Hugo's Public Works Garage. The <br />estimated benefits for the project include a volume reduction of 43 acre-feet, of which 26 <br />acre-feet comes from irrigation. <br /> <br />17. Hugo Gravel Pit Infiltration System <br />This project consists of pumping stormwater runoff from areas adjacent to the gravel pit. <br />It is anticipated the project will provide a volume reduction of 27 acre-feet. <br /> <br />18. Harley Sod Field Irrigation Project <br />This project consists of pumping water from Clearwater Creek to irrigate 100 acres of the <br />Harley Sod operation located south of Frenchman Road and west of Fenway Avenue.