My WebLink
|
Help
|
About
|
Sign Out
Home
2020.08.17 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2020 CC Packets
>
2020.08.17 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2020 1:00:49 PM
Creation date
9/15/2020 12:57:29 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
8/17/2020
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />Development 3 <br />improvements shall be constructed and installed pursuant to the terms and conditions herein set forth <br />in accordance with the plans approved and listed on Exhibit A, subject to all City Resolutions and <br />approvals listed in Exhibit B, subject to final approval by the City, and in accordance with City <br />standards and requirements including those listed herein. In addition, all public street, utility, and <br />storm drainage improvements shall comply with the City’s adopted Specification Book and the <br />direction of City staff. <br /> <br /> 3. Authorization to Proceed with Construction. Developer agrees not to <br />commence any grading, utility or street work within the plat until the following are completed: <br /> 1) Construction plans are approved by the City and distributed. <br /> 2) Pre-construction conference is held. <br /> 3) Notice to Proceed is issued. <br /> <br /> 4. Construction Observation. The City, for its benefit, will provide staff of its <br />choosing to provide construction observation for the public street, utility, and storm drainage <br />improvements outlined in this agreement. All costs associated with construction observation and <br />inspection will be the responsibility of the Developer. The Developer shall allow to the City staff and <br />City consultants access to the property to allow for this work to occur. <br /> <br /> 5. Miscellaneous Requirements. <br /> <br /> a) Property Corners: All property corners as identified on the plat must <br />be monumented with iron surveyor's pipes by the Developer prior to final project acceptance of the <br />development. <br /> b) Drainage Easements: Drainage easements shall be given so as to <br />cover wetlands and stormwater ponding areas based upon 100-year high water levels. <br /> c) Soils Testing: Soils inspection and compaction testing by a registered <br />professional engineer shall be accomplished on all lots where filling is required, in accordance with <br />the approved Grading Plan. A minimum of one (1) compaction test for all developed lots shall be <br />obtained for every two (2) foot increment of fill that is placed. A summary of all inspections and <br />compaction tests for all developed lots shall be provided to the City upon completion of the grading. <br />Soil compaction tests shall be provided for respective lot prior to the issuance of a building permit for <br />each respective lot. <br /> d) Private Utilities: All utilities, including electricity, telephone, natural <br />gas and cable television, shall be installed underground. <br /> e) Mailboxes: Developer shall coordinate mailbox locations with the <br />Postmaster. <br /> f) Street Lights: Street lights shall be installed within the plat <br />according to a street lighting plan which will first be approved by the City Engineer. Developer
The URL can be used to link to this page
Your browser does not support the video tag.