<br /> <br /> <br />Development 4 <br />shall also submit its street lighting plan to the applicable power company for its review, comment <br />and approval. The installation of the street lights shall be coordinated with the applicable power <br />company so that the street light system is installed, constructed and operated in such a manner as <br />will harmoniously exist with other street lights within the area. <br /> g) Working Hours: Construction activity, including equipment startup <br />and fueling, can only occur between the hours of 7:00 a.m. and 7:00 p.m. Monday through Friday; <br />8:00 a.m. and 5:00 p.m. on Saturdays; at no time on Sundays or holidays. <br /> h) Street Sweeping: Developer shall sweep and/or otherwise clean all <br />streets, as needed, within and adjacent to the Development property as a result of construction <br />activities associated with the plat until final acceptance of the improvements. If the streets are not <br />maintained in a manner acceptable to the City, the City will arrange for the street sweeping at <br />Developer’s cost. <br /> i) Placement of Bituminous Wear Course: The bituminous wear <br />course can be placed on all streets once all of the following have occurred: <br /> 1. A Certificate of Occupancy has been issued for at least 75% of <br />the lots or a cash escrow in the amount of $10,000 has been <br />deposit with the City which will be held until 75% of the lots <br />have received Certificates of Occupancy. At the City’s <br />discretion, the wear course may be placed prior to having 75% <br />occupancy. If applicable, the warranty period shall be <br />extended an additional one (1) year for a total of two (2) years <br />from final acceptance. In no case shall the wear course be <br />placed with less than 50% occupancy. <br /> 2. The base course on all streets has been in place for at least one <br />full freeze-thaw cycle. <br /> 3. City staff or its assignees have visually inspected all roadways <br />and curb within the Development, and any repairs necessary <br />as a result of said inspection are complete and written approval <br />issued. <br /> <br /> 6. Project Completion: All work for improvements listed herein on Exhibit A, <br />including street, sanitary sewer, storm sewer, and municipal water, shall be completed subject to the <br />approval of the City in accordance with the approved plans. All improvements shall be substantially <br />completed to the reasonable satisfaction and approval of the City within twelve (12) months of the <br />execution of this agreement. Substantial completion shall consist of all work with the exception of <br />placement of the bituminous wear course and completion of the final punchlist. The Developer shall <br />be excused from the strict completion date set forth herein if written notice is received from the <br />Developer of the existence of causes over which the Developer has no control which will delay the